Sökning: onr:"swepub:oai:DiVA.org:kth-267856" >
System development ...
Abstract
Ämnesord
Stäng
- In this paper, we propose a simulation method based on backward simulation and process-oriented simulation to take into account the characteristics of shipbuilding production, which is an order-based industry with a job shop production environment. The shipyard production planning process was investigated to analyze the detailed process, variables and constraints of mid-term production planning. Backward and process-centric simulation methods were applied to the mid-term production planning process and an improved planning process, which considers the shipbuilding characteristics, was proposed. Based on the problem defined by applying backward process-centric simulation, a system which can conduct Discrete Event Simulation (DES) was developed. The developed mid-term planning system can be linked with the existing shipyard Advanced Planning System (APS). Verification of the system was performed with the actual shipyard mid-term production data for the four ships corresponding to a one-year period.
Ämnesord
- TEKNIK OCH TEKNOLOGIER -- Maskinteknik (hsv//swe)
- ENGINEERING AND TECHNOLOGY -- Mechanical Engineering (hsv//eng)
Nyckelord
- Backward simulation
- Process-centric simulation
- Shipyard advanced planning system
- Shipyard production planning
- Shipyard simulation system
Publikations- och innehållstyp
- ref (ämneskategori)
- art (ämneskategori)
Hitta via bibliotek
Till lärosätets databas