SwePub
Tyck till om SwePub Sök här!
Sök i SwePub databas

  Utökad sökning

Träfflista för sökning "WFRF:(Wojciechowski Adam 1982) "

Sökning: WFRF:(Wojciechowski Adam 1982)

  • Resultat 1-10 av 24
Sortera/gruppera träfflistan
   
NumreringReferensOmslagsbildHitta
1.
  • Almgren, Torgny, 1962, et al. (författare)
  • Optimization models for improving periodic maintenance schedules by utilizing opportunities
  • 2012
  • Ingår i: Proceedings of 4th Production and Operations Management World Conference, July 2012.
  • Konferensbidrag (refereegranskat)abstract
    • We present mathematical models for finding optimal opportunistic maintenance schedules for systems, in which components are assigned maximum replacement intervals. Our mod- els are applied to safety-critical components in an aircraft engine, for which maintenance opportunities naturally arise since entire modules are sent to the workshop when mainte- nance is required on one or more components. Case study results illustrate the advantage of the mathematical models over simpler policies, the benefit of coordinating the maintenance in economically dependent systems, and that our models can be utilized also for strategic investment decision support.
  •  
2.
  • Almgren, Torgny, 1962, et al. (författare)
  • The opportunistic replacement problem: analysis and case studies
  • 2011
  • Annan publikation (övrigt vetenskapligt/konstnärligt)abstract
    • We consider an optimization model for determining optimal opportunistic maintenance (that is, component replacement) schedules when data is deterministic. This problem generalizes that of Dickman, Epstein, and Wilamowsky [21] and is a natural starting point for the modelling of replacement schedules when component lives are non-deterministic. We show that this basic opportunistic replacement problem is NP-hard. We show that the convex hull of the set of feasible replacement schedules is full-dimensional, and that all the necessary inequalities also are facet-inducing. We show that when maintenance occasions are fixed, the remaining problem can be stated as a linear program; when maintenance costs are monotone with time, the latter is solvable through a greedy procedure. Results from a series of case studies performed in the areas of aircraft engine and wind turbine maintenance are also reported. These illustrate the advantages of utilizing opportunistic maintenance activities based on a complete optimization model, as compared to simpler policies.
  •  
3.
  • Almgren, Torgny, 1962, et al. (författare)
  • The opportunistic replacement problem: theoretical analyses and numerical tests
  • 2012
  • Ingår i: Mathematical Methods of Operations Research. - : Springer Science and Business Media LLC. - 1432-2994 .- 1432-5217. ; 76:3, s. 289-319
  • Tidskriftsartikel (refereegranskat)abstract
    • We consider a model for determining optimal opportunistic maintenance schedules with respect to a maximum replacement interval. This problem generalizes that of Dickman et al. (J Oper Res Soc India 28:165–175, 1991) and is a natural starting point for modelling replacement schedules of more complex systems. We show that this basic opportunistic replacement problem is NP-hard, that the convex hull of the set of feasible replacement schedules is full-dimensional, that all the inequalities of the model are facet-inducing, and present a new class of facets obtained through a {0,1/2}-Chvátal–Gomory rounding. For costs monotone with time, a class of elimination constraints is introduced to reduce the computation time; it allows maintenance only when the replacement of at least one component is necessary. For costs decreasing with time, these constraints eliminate non-optimal solutions. When maintenance occasions are fixed, the remaining problem is stated as a linear program and solved by a greedy procedure. Results from a case study on aircraft engine maintenance illustrate the advantage of the optimization model over simpler policies. We include the new class of facets in a branch-and-cut framework and note a decrease in the number of branch-and-bound nodes and simplex iterations for most instance classes with time dependent costs. For instance classes with time independent costs and few components the elimination constraints are used favorably. For fixed maintenance occasions the greedy procedure reduces the computation time as compared with linear programming techniques for all instances tested.
  •  
4.
  • Almgren, Torgny, 1962, et al. (författare)
  • The replacement problem: A polyhedral and complexity analysis. The complete version
  • 2009
  • Annan publikation (övrigt vetenskapligt/konstnärligt)abstract
    • We consider an optimization model for determining optimal opportunistic maintenance (that is, component replacement) schedules when data is deterministic. This problem, which generalizes that of Dickman et al., is a natural starting point for the modelling of replacement schedules when component lives are non-deterministic, whence a mathematical study of the model is of large interest. We show that the convex hull of the set of feasible replacement schedules is full-dimensional, and that all the necessary inequalities are facet-inducing. Additional facets are then provided through Chvatal-Gomory rounding. We show that when maintenance occasions are fixed, the remaining problem reduces to a linear program; in some cases the latter is solvable through a greedy procedure. We further show that this basic replacement problem is NP-hard.
  •  
5.
  •  
6.
  • Besnard, Francois, 1983, et al. (författare)
  • A stochastic model for opportunistic maintenance planning of offshore wind farms
  • 2011
  • Ingår i: 2011 IEEE PES Trondheim PowerTech: The Power of Technology for a Sustainable Society, POWERTECH 2011; Trondheim; 19 June 2011 through 23 June 2011. - 9781424484195
  • Konferensbidrag (refereegranskat)abstract
    • A sound maintenance planning is of crucial importance for wind power farms, and especially for offshore locations. This paper presents a stochastic optimization model for opportunistic service maintenance of offshore wind farms. The model takes advantage of 7 days wind production ensemble forecast and opportunities at corrective maintenance activities in order to perform the service maintenance tasks at the lowest cost. The model is based on a rolling horizon, i.e. the optimization is performed on a daily basis to update the maintenance planning based on the updated production and weather forecasts. An example based on real wind data is used to demonstrate the value of the proposed approach. In this example, it is shown that 32% of the cost for production losses and transportation could be saved. © 2011 IEEE.
  •  
7.
  • Besnard, Francois, et al. (författare)
  • An Optimization Framework for Opportunistic Maintenance of Offshore Wind Power System
  • 2009
  • Ingår i: 2009 IEEE BUCHAREST POWERTECH, VOLS 1-5. - NEW YORK : IEEE. - 9781424422340 ; , s. 2970-2976
  • Konferensbidrag (refereegranskat)abstract
    • A sound maintenance planning is of crucial importance for wind power farms, and especially for offshore locations. There is a large potential in cost savings by maintenance optimization to make the projects more cost-efficient. This paper presents an opportunistic maintenance optimization model for offshore wind power system. The model takes advantage of wind forecasts and corrective maintenance activities in order to perform preventive maintenance tasks at low costs. The approach is illustrated with an example to demonstrate the value of the optimization. In this example 43% of the cost to perform preventive maintenance could be saved using the proposed method.
  •  
8.
  •  
9.
  • Gollowitzer, S., et al. (författare)
  • A Comparison of Several Models for the Hamiltonian p-Median Problem
  • 2014
  • Ingår i: Networks. - : Wiley. - 0028-3045 .- 1097-0037. ; 63:4, s. 350-363
  • Tidskriftsartikel (refereegranskat)abstract
    • The Hamiltonian p-median problem consists of determining p disjoint cycles of minimum total cost covering all vertices of a graph. We present several new and existing models for this problem, provide a hierarchy with respect to the quality of the lower bounds yielded by their linear programming relaxations, and compare their computational performance on a set of benchmark instances. We conclude that three of the models are superior from a computational point of view, two of which are introduced in this article. (C) 2014 Wiley Periodicals, Inc.
  •  
10.
  • Gollowitzer, Stefan, et al. (författare)
  • New Models for and Numerical Tests of the Hamiltonian p-Median Problem
  • 2011
  • Ingår i: Lecture Notes in Computer Science. - Berlin, Heidelberg : Springer Berlin Heidelberg. - 0302-9743 .- 1611-3349. - 9783642215261 ; 6701/2011, s. 385-394
  • Konferensbidrag (refereegranskat)abstract
    • The Hamiltonian p-median problem (HpMP) was introduced by [Branco90]. It is closely related to two well-known problems, namely the Travelling Salesman problem (TSP) and the Vehicle Routing problem (VRP). The HpMP is to find exactly p node-disjoint cycles of minimum edge cost, such that each node of the graph is contained in exactly one cycle. We present three new models for the HpMP problem which differ with regard to the constraints that enforce a maximum number of cycles. We demonstrate that one of the models (SEC) is dominated by another model (PCON) with regard to the LP relaxation. Further, we introduce a class of symmetry breaking constraints. We present results regarding the quality of the lower bounds provided by the respective LP relaxations for two of the models, and provide computational results that demonstrate the computational efficiency.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-10 av 24

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy