SwePub
Tyck till om SwePub Sök här!
Sök i SwePub databas

  Utökad sökning

Träfflista för sökning "WFRF:(Anderson K.) ;mspu:(report)"

Sökning: WFRF:(Anderson K.) > Rapport

  • Resultat 1-3 av 3
Sortera/gruppera träfflistan
   
NumreringReferensOmslagsbildHitta
1.
  • Valenti, S., et al. (författare)
  • PESSTO spectroscopic classification of La Silla-Quest Transients
  • 2012
  • Rapport (övrigt vetenskapligt/konstnärligt)abstract
    • PESSTO is the "Public ESO Spectroscopic Survey of Transient Objects" (http://www.pessto.org) using the ESO New Technology Telescope (NTT) at La Silla and the EFOSC2 (optical) and SOFI (near-IR) spectrographs. It is one of two currently running public spectroscopic surveys at ESO. The survey details are as follows: - PESSTO has 90 nights per year on the NTT: 9 lunations (August to April), 10 nights per lunation (we are not observing May-July).
  •  
2.
  • Bader, Thomas K., 1980-, et al. (författare)
  • Engineering design for anefficient assembly of multi-storycross-laminated timber structures : A survey conducted between November 2020 and November 2021
  • 2023
  • Rapport (övrigt vetenskapligt/konstnärligt)abstract
    • Design for efficient assembly is essential to further enhance the competitiveness of cross-laminated timber building systems for multi-story timber structures. This requires a holistic view from the design of the load bearing structures by structural engineers, over the production, pre-fabrication, and transport to the assembly of the structural elements on-site, which often is done by different companies with input from different stakeholders in the construction process. Especially the design of connections between CLT elements, and CLT and other construction materials and products, as well as the size of CLT elements and possibilities for pre-fabrication are crucial for an efficient assembly process. The paper summarizes findings from expert interviews with a focus on Sweden along the before-mentioned value chain, with the aim to identify current practice and potentials for further improvements. Design for efficient assembly starts at the early-stage design and involves all stakeholders in the design construction process. The reduction of uncertainties in the design and assembly process of multi-storey CLT structures as well as knowledge and experience transfer could lead to more efficient design. The identified requirements for efficient assembly should be combined with a life cycle analysis to quantify the potential for a reduction of the carbon footprint of CLT-based building systems, which is the aim of the ongoing research project ‘Improving the competitive advantage of CLT-based building systems through engineering design and reduced carbon footprint’.
  •  
3.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-3 av 3

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy