1. |
- Abe, K., et al.
(författare)
-
J-PARC Neutrino Beamline Upgrade Technical Design Report
- 2019
-
Rapport (refereegranskat)abstract
- In this document, technical details of the upgrade plan of the J-PARC neutrino beamline for the extension of the T2K experiment are described. T2K has proposed to accumulate data corresponding to 2×1022 protons-on-target in the next decade, aiming at an initial observation of CP violation with 3σ or higher significance in the case of maximal CP violation. Methods to increase the neutrino beam intensity, which are necessary to achieve the proposed data increase, are described.
|
|
2. |
|
|
3. |
- Hoffman, Johan, 1974-, et al.
(författare)
-
The FEniCS project
- 2003
-
Rapport (övrigt vetenskapligt/konstnärligt)abstract
- The goal of the FEniCS project is to develop open-source software for the automation of Computational Mathematical Modeling (CMM). FEniCS is a joint project between the Toyota Technological Institute at Chicago, the University of Chicago, and Chalmers University of Technology. The vision of FEniCS is to set a new standard in CMM, which can be described as the Automation of CMM, towards the goals of generality, efficiency, and simplicity, concerning mathematical methodology, implementation, and application.
|
|
4. |
|
|