SwePub
Tyck till om SwePub Sök här!
Sök i SwePub databas

  Utökad sökning

Träfflista för sökning "WFRF:(Mårtensson Thomas) ;pers:(Fasth Åsa)"

Sökning: WFRF:(Mårtensson Thomas) > Fasth Åsa

  • Resultat 1-6 av 6
Sortera/gruppera träfflistan
   
NumreringReferensOmslagsbildHitta
1.
  • Dencker, Kerstin, 1972-, et al. (författare)
  • Characteristic of a proactive assembly system
  • 2008
  • Ingår i: MANUFACTURING SYSTEMS AND TECHNOLOGIES FOR THE NEW FRONTIER. - NEW YORK : SPRINGER. - 9781848002661 - 9781848002678 ; , s. 123-128
  • Konferensbidrag (refereegranskat)abstract
    • Competitive assembly systems must cope with frequent demand changes, requiring drastically shortened resetting and ramp-up times. Characteristics of assembly systems capable of rapid change are e.g. Flexibility; Robustness, Agility, and ability to handle frequent changes and disturbances. This paper proposes proactivity as a vital factor of semi-automated assembly systems to increase speed of change. Proactive systems utilize the full potential of human operators and technical systems. Such systems have ability to dynamically change system automation levels, resulting in decrease of time consumed for assembly tasks. Proactivity criteria for assembly systems are reviewed based on theory and industrial case studies
  •  
2.
  • Dencker, Kerstin, 1972-, et al. (författare)
  • Proactive Assembly Systems – realizing the potential of human collaboration with automation
  • 2009
  • Ingår i: Annual Reviews in Control. - : Elsevier. - 1367-5788 .- 1872-9088. ; 33:2, s. 230-237
  • Forskningsöversikt (refereegranskat)abstract
    • Manufacturing competitiveness frequently relies on company ability to rapidly reconfigure their assembly systems. This paper introduces assembly system proactivity, a concept based on interrelated levels of automation, human competence, and information handling. Increased and structured human involvement contributes to increased system ability to proactively address predicted and unpredicted events. Correct involvement of human operators will utilize the combined potential of human and technical capabilities, providing cost-efficient assembly system solutions. The ProAct project is developing proactive assembly system models and evaluates proactive, feature-based solutions. Focus is on realising the potential of cost-efficient and semi-automated systems with relevant human involvement, i.e. highly skilled operators who add flexibility and functionality.
  •  
3.
  • Fasth, Åsa, 1978, et al. (författare)
  • Designing proactive assembly systems : Criteria and interaction between automation, information, and competence
  • 2010
  • Ingår i: Asian International Journal of Science and Technology in production and manufacturing engineering (AIJSTPME). - 1906-151X. ; vol 2 issue 4
  • Tidskriftsartikel (refereegranskat)abstract
    • Production companies of today face extreme challenge to meet the rapid changes and increased flexibility that mass customization require. More and more customers are requiring the product to suite specific needs such as design, function and sustainability. These requirements results in increasing demands for the developers of the product but also for the personnel who will assemble the products in the final assembling. This paper suggests the need for further development, primarily addressing time parameters in dynamically changing assembly systems. We propose proactivity as a vital characteristic of semi-automated assembly systems, to increase fulfilment of customer demands and decrease non value-adding tasks. In proactive assembly systems, the potential of human operators and technical systems is utilised. Criteria for proactivity are reviewed from automation, information, and competence perspectives. Empirical data have been collected from five production companies in Sweden.
  •  
4.
  • Fasth, Åsa, 1978, et al. (författare)
  • Designing proactive assembly systems – Criteria and interaction between Automation, Information, and Competence
  • 2009
  • Ingår i: CIRP Conference on Manufacturing Systems, University of Grenoble, France, 2009.
  • Konferensbidrag (refereegranskat)abstract
    • Increasing customisation of products results in decreasing production batch sizes, especially in the final assembly. Industry must therefore increase their capability to handle smaller batches as well as radically decrease set up time between different product groups and new products. This paper suggests the need for further development, primarily addressing time parameters in dynamically changing assembly systems. We propose proactivity as a vital characteristic of semi-automated assembly systems, to increase fulfilment of customer demands and decrease non value-adding tasks. In proactive assembly systems, the full and complementary potential of human operators and technical systems is utilised. Criteria for proactivity in assembly systems are reviewed from automation, information, and competence perspectives.
  •  
5.
  • Mårtensson, Lena, 1944-, et al. (författare)
  • Designing proactive assembly systems (ProAct) : Criteria and interaction between automation, information and competence
  • 2009
  • Ingår i: Asian international journal of science and technology in production and manufacturing engineering. ; 2:4, s. 1-13
  • Tidskriftsartikel (övrigt vetenskapligt/konstnärligt)abstract
    • Production companies of today face extreme challenge to meet the rapid changes and increased flexibility that mass customization require. More and more customers are requiring the product to suite specific needs such as design, function and sustainability. These requirements results in increasing demands for the developers of the product but also for the personnel who will assemble the products in the final assembling.This paper suggests the need for further development, primarily addressing time parameters in dynamically changing assembly systems. We propose proactivity as a vital characteristic of semi-automated assembly systems, to increase fulfilment of customer demands and decrease non value-adding tasks. In proactive assembly systems, the potential of human operators and technical systems is utilised. Criteria for proactivity are reviewed from automation, information, and competence perspectives. Empirical data have been collected from five production companies in Sweden.
  •  
6.
  • Åsa, Fasth, et al. (författare)
  • Designing proactive assembly systems : Criteria and interaction between automation, information, and competence
  • 2009
  • Ingår i: Proceedings of the 42nd CIRP Conference on Manufacturing Systems, Grenoble.
  • Konferensbidrag (refereegranskat)abstract
    • Increasing customisation of products results in decreasing production batch sizes, especially in the final assembly. Industry must therefore increase their capability to handle smaller batches as well as radically decrease set up time between different product groups and new products. This paper suggests the need for further development, primarily addressing time parameters in dynamically changing assembly systems. We propose customer demands and decrease non value-adding tasks. In proactive assembly systems, the full and complementary potential of human operators and technical systems is utilised. Criteria for proactivity in assembly systems are reviewed from automation, information, and competence perspectives.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-6 av 6

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy