  • Status report of the multipurpose superconducting electron cyclotron resonance ion source
  • 2008
  • In: Review of Scientific Instruments. - : AIP Publishing. - 0034-6748 .- 1089-7623. ; 79:2, s. 02A326-
  • Journal article (peer-reviewed)abstract
    • Intense heavy ion beam production with electron cyclotron resonance (ECR) ion sources is a common requirement for many of the accelerators under construction in Europe and elsewhere. An average increase of about one order of magnitude per decade in the performance of ECR ion sources was obtained up to now since the time of pioneering experiment of R. Geller at CEA, Grenoble, and this trend is not deemed to get the saturation at least in the next decade, according to the increased availability of powerful magnets and microwave generators. Electron density above 1013 cm(-3) and very high current of multiply charged ions are expected with the use of 28 GHz microwave heating and of an adequate plasma trap, with a B-minimum shape, according to the high B mode concept [S. Gammino and G. Ciavola, Plasma Sources Sci. Technol. 5, 19 (1996)]. The MS-ECRIS ion source has been designed following this concept and its construction is underway at GSI, Darmstadt. The project is the result of the cooperation of nine European institutions with the partial funding of EU through the sixth Framework Programme. The contribution of different institutions has permitted to build in 2006-2007 each component at high level of expertise. The description of the major components will be given in the following with a view on the planning of the assembly and commissioning phase to be carried out in fall 2007. An outline of the experiments to be done with the MS-ECRIS source in the next two years will be presented.
  •  
2.
  • Vanhanen, Sanna-Leena, et al. (author)
  • Neuroradiological findings (MRS, MRI, SPECT) in infantile neuronal ceroid-lipofuscinosis (infantile CLN1) at different stages of the disease.
  • 2004
  • In: Neuropediatrics. - : Georg Thieme Verlag KG. - 0174-304X .- 1439-1899. ; 35:1, s. 27-35
  • Journal article (peer-reviewed)abstract
    • Infantile neuronal ceroid-lipofuscinosis (infantile CLN1) is a progressive and uniformly fatal lysosomal storage disease of the nervous system. The purpose of this study was to compare the findings of various radiological examinations of the brain in the course of infantile CLN1 in order to evaluate the relative usefulness of the methods and their potential for monitoring therapeutic interventions. We examined eight infantile CLN1 patients, 51 studies, in various stages of the disease--preclinical to late stage--with proton magnetic resonance spectroscopy (1H-MRS), MRI, and perfusion SPECT, and in addition three benzodiazepine (BZ) receptor ligand SPECT studies. Both 1H-MRS and MRI showed abnormal findings before clinical manifestations of the disease. Cortical hypoperfusion and loss of cortical BZ receptors revealed by SPECT appeared simultaneously with clinical signs. After the age of 4 years MRI and SPECT alterations progressed minimally, whereas 1H-MRS showed progressive deterioration of neurometabolism. Of the four methods used in this study, MRI proved to be the most practicable for diagnosing infantile CLN1; the final diagnosis of infantile CLN1 is confirmed by the characteristic clinical picture and DNA or PPT enzyme analysis. The combination of 1H- MRS and MRI could be most useful for monitoring therapeutic interventions.
  •  
3.
  • Ciavola, G., et al. (author)
  • Status report of the MS-ECRIS construction
  • 2007
  • In: High Energy Physics & Nuclear Physics - Chinese Edition. - 0254-3052. ; 31, s. 13-17
  • Journal article (peer-reviewed)abstract
    • The design of each component of the Multipurpose Superconducting ECR Ion Source (MS-ECRIS) has been completed and some items are ready. The magnets and the cryostat are under construction at ACCEL and the commissioning is scheduled for March 2007. The mechanical have been optimized and their construction is under way, the microwave system is under refurbishment and the 65kV power supply is available and upgraded for afterglow operations. Pumping and extraction system were adapted to the EIS testbench of GSI Darmstadt. The description of,each part will be given in the paper along with a schedule of the forthcoming development and experiments.
  •  
4.
  •  
Skapa referenser, mejla, bekava och länka
  • Result 1-4 of 4

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Close

Copy and save the link in order to return to this view