SwePub
Sök i LIBRIS databas

  Utökad sökning

id:"swepub:oai:DiVA.org:liu-48876"
 

Sökning: id:"swepub:oai:DiVA.org:liu-48876" > Rescheduling consid...

Rescheduling considerations for production planning using control theory

Tang, Ou (författare)
Linköpings universitet,Produktionsekonomi,Tekniska högskolan
Grubbström, Robert W. (författare)
Linköpings universitet,Produktionsekonomi,Tekniska högskolan
 (creator_code:org_t)
2002
2002
Engelska.
Ingår i: International journal of industrial engineering. - 1072-4761 .- 1943-670X. ; 9:3, s. 258-264
  • Tidskriftsartikel (refereegranskat)
Abstract Ämnesord
Stäng  
  • The rescheduling problem has been addressed recently in studies of ours. The alternatives to reschedule or to stay are compared incorporating a rescheduling cost. This paper applies control theory methodology to model this type of production-inventory problem. Its objective is to evaluate the response of the system when rescheduling activities are triggered. Attempts have also been made to evaluate the rescheduling cost from the system response aspect, although these do not pretend to capture all costs of rescheduling.

Nyckelord

rescheduling
control theory
Laplace transform
production-inventory system
TECHNOLOGY
TEKNIKVETENSKAP

Publikations- och innehållstyp

ref (ämneskategori)
art (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Hitta mer i SwePub

Av författaren/redakt...
Tang, Ou
Grubbström, Robe ...
Artiklar i publikationen
International jo ...
Av lärosätet
Linköpings universitet

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy