SwePub
Sök i LIBRIS databas

  Utökad sökning

id:"swepub:oai:DiVA.org:ltu-63049"
 

Sökning: id:"swepub:oai:DiVA.org:ltu-63049" > Cover-Time Planning...

Cover-Time Planning/Takt Planning : A technique for Materials Requirement and Production Planning

Segerstedt, Anders (författare)
Luleå tekniska universitet,Industriell Ekonomi
 (creator_code:org_t)
Elsevier, 2017
2017
Engelska.
Ingår i: International Journal of Production Economics. - : Elsevier. - 0925-5273 .- 1873-7579. ; 194, s. 25-31
  • Tidskriftsartikel (refereegranskat)
Abstract Ämnesord
Stäng  
  • Cover-Time Planning, or Takt Planning, is presented. It is a system for calculating material requirements and start of purchases and production. Requested production rates of sales items, or alternative prefabricated modules in stock, are “broken down”, exploded, to create the need for components, for all underlying items (articles) in the Bill of Material. Inventory and already ordered replenishments are compared with the item's desired production rate. How long already made actions are expected to cover the desired expected sales and production rates is compared with the item's lead time; if a forward future shortage is likely the article is signalled for a refill. With examples is described how make-to-order production is done easily. The method is a type of reorder point system, but with time instead of quantity as decision variable. Unlike a traditional reorder point system increases and decreases of production can be planned. Future work load in various production sections can be estimated. It is described how an “Available-to-promise”-system should be designed and used. Cover-Time Planning (CTP) is a complete alternative to Materials Requirements Planning (MRP). CTP responds faster than MRP, since MRP for each structural level uses a batch size to "break down" and to magnify the need at the underlying level. In the end a large material acquisition needs to be ordered maybe just to build a single end item. CTP uses the end item requirement rates on all structural levels shifted with the lead times, when customer demand changes, the entire production chain react simultaneously

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Maskinteknik -- Produktionsteknik, arbetsvetenskap och ergonomi (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Mechanical Engineering -- Production Engineering, Human Work Science and Ergonomics (hsv//eng)

Nyckelord

Industrial Logistics
Industriell logistik

Publikations- och innehållstyp

ref (ämneskategori)
art (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Hitta mer i SwePub

Av författaren/redakt...
Segerstedt, Ande ...
Om ämnet
TEKNIK OCH TEKNOLOGIER
TEKNIK OCH TEKNO ...
och Maskinteknik
och Produktionstekni ...
Artiklar i publikationen
International Jo ...
Av lärosätet
Luleå tekniska universitet

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy