Badush Dam : Controversy and Future Possibilities

Adamo, Nasrat (författare)
LTU Team
Sissakian, Varoujan K. (författare)
University of Kurdistan, Hewler, KRG. Private Consultant Geologist, Erbil, Iraq
Al-Ansari, Nadhir (författare)
Luleå tekniska universitet,Geoteknologi
visa fler...
Knutsson, Sven (författare)
Luleå tekniska universitet,Geoteknologi
Laue, Jan (författare)
Luleå tekniska universitet,Geoteknologi
visa färre...
LTU Team University of Kurdistan, Hewler, KRG Private Consultant Geologist, Erbil, Iraq (creator_code:org_t)
UK : Scientific Press International Limited, 2018
2018
Engelska.
Ingår i: Journal of Earth Sciences and Geotechnical Engineering. - UK : Scientific Press International Limited. - 1792-9040 .- 1792-9660. ; 8:2, s. 17-33
  • Tidskriftsartikel (refereegranskat)
Abstract Ämnesord
Stäng  
  • Badush Dam is believed to be the first dam in the world which is designed to protect from the flood wave which could result from the collapse of another dam; in this case Mosul Dam.  Badush Dam construction was started in 1988 but it was stopped two years later due to unexpected reasons. From that time on many attempts were made to resume construction without success. Its value was stressed in a multitude of studies and technical reports amid conflict of opinions on how to do this.  The original design of the dam as a protection dam was intended to have a large part of the reservoir empty to accommodate the volume of the expected flood wave for only a few months during which time it’s content are released in a controlled and safe way to the downstream. The lower part of Badush Dam which has a limited height continues before and after this event to act as a low head power generation facility. Among the later studies on the dam, there were suggestions to introduce changes to the design of the unfinished dam which covered the foundation treatment and also asked for constructing a diaphragm in the dam. A long controversy is still going on with many possibilities but with no hope to reach a final solution soon. Any rational solution must consider both Badush Dam and Mosul Dam together as the safety issue involves both of them. This paper may be seen in six paragraphs. The first three describe in brief the history, the outline design and foundation treatment of the dam, therefore, setting the background to follow the conflicting views over its purpose and future which is discussed in the following two paragraphs. The final paragraph is devoted to discussion and our conclusions.

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Geoteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Geotechnical Engineering (hsv//eng)

Nyckelord

Mosul Dam
Badush Dam
flood wave
protection dam
freeboard
foundation treatment
diaphragm
Soil Mechanics
Geoteknik

Publikations- och innehållstyp

ref (ämneskategori)
art (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy