Follow-up study from a seven year performance contract ending in 2010

Karlsson, Robert (författare)
Statens väg- och transportforskningsinstitut,Väg- och banteknik, VBA
Wennström, Jonas (författare)
Statens väg- och transportforskningsinstitut,Väg- och banteknik, VBA
Enocksson, Carl-Gösta (författare)
 (creator_code:org_t)
Linköping : Statens väg- och transportforskningsinstitut, 2012
2012
Engelska.
Ingår i: EPAM 2012: Malmö, Sweden, 5–7 September. - Linköping : Statens väg- och transportforskningsinstitut. - 9789163714320
  • Konferensbidrag (övrigt vetenskapligt/konstnärligt)
Abstract Ämnesord
Stäng  
  • The Swedish Transport Administration aims at improving procurement of road construction and maintenance to create incentives for contractors to develop their skills and efficiency. Introduction of performance requirements is believed to encourage new technical solutions that are more adapted to object specific situations. In order to develop procurement procedures for performance contracts, the Swedish Transport Administration has initiated a number of pilot projects. Pilot project Road N610 included design, construction, maintenance and operation of a new road. It was initiated in 1999 by developing procurement documents and finally opened for traffic in 2003. The bids were evaluated following laws of public procurement based on technical solution, price, organization, quality assurance and references. The winning bid scored about average in these categories. In 2010, the contract ended and the responsibility was handed over from the contractor to the road administration. The requirements were related to both pavement layers (wear resistance, durability, stability) and road surface (friction, rutting, evenness, cross fall, cracking and ravelling). To ensure the long term performance, a requirement was also employed on the road’s structural strength based on a falling weigh deflectometer index. A bonus-malus system was tied to the requirements. The pilot project has been monitored closely and reports have been issued from the development of procurement documents and from the procurement and construction phases. This paper report experience gained with emphasis on the technical outcome. Observations from the construction stage and data from verification of performance confirm that the contractor has taken necessary measures to meet requirements and consequently adapted the pavement design and construction during the whole contract period to minimize costs and risks. A number of issues are identified with respect to future improvements in procurement procedures. A major client risk in performance contracts is related to ensuring long term performance at acceptable costs for maintenance and to identify responsibilities for inferior performance.

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Infrastrukturteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Infrastructure Engineering (hsv//eng)

Nyckelord

Contract
Performance
Pavement
Follow up study
Evaluation (assessment)
Avtal
Prestanda
Överbyggnad
Uppföljningsstudier
Utvärdering
32 Road: Pavement design
32 Road: Pavement design
02 Road: Economics
02 Road: Economics

Publikations- och innehållstyp

vet (ämneskategori)
kon (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy