SwePub
Sök i LIBRIS databas

  Utökad sökning

id:"swepub:oai:lup.lub.lu.se:61ccef27-41f1-428f-888a-653b0e7213fc"
 

Sökning: id:"swepub:oai:lup.lub.lu.se:61ccef27-41f1-428f-888a-653b0e7213fc" > Electricity Supply ...

Electricity Supply Reliability: Evaluation of Improvement Solutions for Existing Electricity Networks

Roos, Fredrik (författare)
Lund University,Lunds universitet,Industriell elektroteknik och automation,Institutionen för biomedicinsk teknik,Institutioner vid LTH,Lunds Tekniska Högskola,Industrial Electrical Engineering and Automation,Department of Biomedical Engineering,Departments at LTH,Faculty of Engineering, LTH
 (creator_code:org_t)
ISBN 9188934411
2005
Engelska 99 s.
  • Licentiatavhandling (övrigt vetenskapligt/konstnärligt)
Abstract Ämnesord
Stäng  
  • Regulation of the electricity network business is continuously under development in many countries. This is a reaction of an increasingly electricity dependent society, which demands electricity supplies at acceptable quality levels and at reasonable tariffs. Thus, electric network companies are facing new requirements that change the conditions for exercising network activities. Generally, incentives are given to the network companies to maintain the present level of reliability in a cost-efficient way. In Norway, however, incentives are given to the network companies to plan, operate and maintain the networks in a socio-economically optimal way, taking into account the supply-interruption cost to the customers. Therefore, in Norway, electricity network companies strive to identify and implement the most cost-efficient reliability improvement projects, i.e., the projects that yield the greatest overall reduction in supply-interruption cost to the customers for the invested money. In this thesis, implementations of reliability improvement solutions on a test system have been evaluated from a socio-economical point of view. For each of the alternative solutions implemented on the test system, the average annual supply-interruption cost to the customers supplied from the test system has been estimated. Furthermore, the maximum annual capital cost associated with the implementation of each solution has been estimated. Then, a reliability improvement solution is considered justified socioeconomically if the capital cost associated with its implementation is less than the resulting reduction in the interruption cost to the customers. The general conclusion from this thesis work is that the supply-interruption cost to the customers supplied from a test system can be reduced significantly by implementing reliability improvement solutions that are justified socioeconomically. Even if the uncertainty of the input data is taken into account, it is obvious from the results that the interruption cost to the test system customers can be reduced to at least half the initial value.

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Elektroteknik och elektronik -- Annan elektroteknik och elektronik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Electrical Engineering, Electronic Engineering, Information Engineering -- Other Electrical Engineering, Electronic Engineering, Information Engineering (hsv//eng)

Publikations- och innehållstyp

lic (ämneskategori)
vet (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Hitta mer i SwePub

Av författaren/redakt...
Roos, Fredrik
Om ämnet
TEKNIK OCH TEKNOLOGIER
TEKNIK OCH TEKNO ...
och Elektroteknik oc ...
och Annan elektrotek ...
Av lärosätet
Lunds universitet

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy