- Construction of the MAX IV facility started in 2010 and commissioning is expected to begin in 2014. Once com- pleted, the facility will include two storage rings for the production of synchrotron radiation. The 3 GeV ring will house insertion devices for the production of x-rays, while the 1.5 GeV ring will serve UV and IR users. Recently, the lattice and optics of the 1.5 GeV storage ring have been modified as a result of detailed magnet and vacuum system design. This paper discusses the lattice and optics changes as well as their effects.