Sökning: id:"swepub:oai:lup.lub.lu.se:97466716-29a2-4286-bea0-8343afea85d4" >
A benchmark study o...
A benchmark study of controlled emptying of equalization basins
-
- Bolmstedt, Jon (författare)
- Lund University,Lunds universitet,Industriell elektroteknik och automation,Institutionen för biomedicinsk teknik,Institutioner vid LTH,Lunds Tekniska Högskola,Industrial Electrical Engineering and Automation,Department of Biomedical Engineering,Departments at LTH,Faculty of Engineering, LTH
-
- Olsson, Gustaf (författare)
- Lund University,Lunds universitet,Industriell elektroteknik och automation,Institutionen för biomedicinsk teknik,Institutioner vid LTH,Lunds Tekniska Högskola,Industrial Electrical Engineering and Automation,Department of Biomedical Engineering,Departments at LTH,Faculty of Engineering, LTH
-
(creator_code:org_t)
- 2005
- 2005
- Engelska.
-
Ingår i: Water Science and Technology. - 0273-1223. ; 52:12, s. 113-121
- Relaterad länk:
-
http://www.iwaponlin...
-
visa fler...
-
https://lup.lub.lu.s...
-
visa färre...
Abstract
Ämnesord
Stäng
- Storm tanks, or equalization basins, have been used for many years in sewer or wastewater treatment systems to reduce the amount of combined sewer overflows. In this paper, a systematic control of an equalization basin is used not only to dampen or reduce the hydraulic load, but also to systematically improve the effluent quality in a nitrogen removal plant. It is demonstrated that the effluent ammonia concentration is the key component. The Benchmark Simulation Model 1, implemented in MATLAB/Simulink, has been used to perform the evaluations. It has been extended with systematic rainfall generations. Intuitively, it is apparent that the equalization basin should be emptied before a rainfall. This requires a prediction capacity. It is shown that the choice of prediction time is by no means trivial and it is not true that a long prediction horizon is a,ways advantageous.
Ämnesord
- TEKNIK OCH TEKNOLOGIER -- Elektroteknik och elektronik -- Annan elektroteknik och elektronik (hsv//swe)
- ENGINEERING AND TECHNOLOGY -- Electrical Engineering, Electronic Engineering, Information Engineering -- Other Electrical Engineering, Electronic Engineering, Information Engineering (hsv//eng)
Nyckelord
- integrated control
- control strategies
- equalization basins
- wastewater
Publikations- och innehållstyp
- art (ämneskategori)
- ref (ämneskategori)
Hitta via bibliotek
Till lärosätets databas