SwePub
Sök i LIBRIS databas

  Utökad sökning

id:"swepub:oai:lup.lub.lu.se:ea53819c-2785-4ba0-b46c-a2dd5cf628c7"
 

Sökning: id:"swepub:oai:lup.lub.lu.se:ea53819c-2785-4ba0-b46c-a2dd5cf628c7" > Towards a Taxonomy ...

Towards a Taxonomy of Planning and Scheduling Methods in the Context of Construction Management.

AlNasseri, Hammad Abdullah (författare)
Lund University,Lunds universitet,Byggproduktion,Institutionen för byggvetenskaper,Institutioner vid LTH,Lunds Tekniska Högskola,Construction Management,Department of Construction Sciences,Departments at LTH,Faculty of Engineering, LTH,Lund University, Lund, Sweden
Widén, Kristian (författare)
Högskolan i Halmstad,Lund University,Lunds universitet,Byggproduktion,Institutionen för byggvetenskaper,Institutioner vid LTH,Lunds Tekniska Högskola,Construction Management,Department of Construction Sciences,Departments at LTH,Faculty of Engineering, LTH,Sustainability, Innovation and Management in Building (SIMB),Lund University, Lund, Sweden
Aulin, Radhlinah (författare)
Lund University,Lunds universitet,Byggproduktion,Institutionen för byggvetenskaper,Institutioner vid LTH,Lunds Tekniska Högskola,Construction Management,Department of Construction Sciences,Departments at LTH,Faculty of Engineering, LTH,Lund University, Lund, Sweden
visa fler...
Klakegg, Ole Jonny (redaktör/utgivare)
visa färre...
 (creator_code:org_t)
Trondheim : Akademika forlag, 2013
2013
Engelska.
Ingår i: [Host publication title missing]. - Trondheim : Akademika forlag. - 9788232102730 ; , s. 570-581
  • Konferensbidrag (refereegranskat)
Abstract Ämnesord
Stäng  
  • Planning and scheduling are considered as one of the most difficult but most important processes from perspectives of project management. These processes involve implementation of a widerange of planning methods used by different organizations with various levels of planning knowledge. The planning methods for scheduling can be classified as traditional methods (e.g. line of balance, Gantt chart and critical path) and modern methods (e.g. last planner and critical chain). Over time these methods had advanced from paper based to computer based. However, some project planners still prefer using the traditional methods despite other new alternatives. Users of those methods have different perspectives about the efficiency and effectiveness of the different planning methods used to manage different projects. Evidences from the secondary data found from extensive literatures have been used to assess the planning and scheduling methods mentioned above. A taxonomy describing each of the method in terms of their theories, key features, application areas, benefits and limitations is presented. The preliminary outcome of this paper may provide a tool to aid organizations in selecting and prioritizing the most appropriate methods to be developed and implemented in planning and scheduling of their projects. It also initializes a theoretical base for more rapid taxonomy studies on the use of different planning and scheduling approaches. As an overall, the present paper reminds practitioners of common ground about its important insights on how such taxonomy studies have potential to make scope of those methods and tools clearer, especially when they compare among them within the same application contexts.

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Byggproduktion (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Construction Management (hsv//eng)

Nyckelord

construction process
planning methods
scheduling
taxonomy
project planners
planning knowledge
construction process

Publikations- och innehållstyp

kon (ämneskategori)
ref (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy