SwePub
Sök i LIBRIS databas

  Utökad sökning

id:"swepub:oai:research.chalmers.se:5a7ec045-7120-49ea-bd81-8d4b97b2c6eb"
 

Sökning: id:"swepub:oai:research.chalmers.se:5a7ec045-7120-49ea-bd81-8d4b97b2c6eb" > Optimal time for co...

Optimal time for contractors to enter infrastructure projects

Antonsson, Freddy (författare)
Chalmers tekniska högskola,Chalmers University of Technology
Lindvall, David (författare)
Chalmers tekniska högskola,Chalmers University of Technology
Lagerkvist, Johan, 1983 (författare)
Chalmers tekniska högskola,Chalmers University of Technology
visa fler...
Rempling, Rasmus, 1976 (författare)
Chalmers tekniska högskola,Chalmers University of Technology
visa färre...
 (creator_code:org_t)
Elsevier BV, 2021
2021
Engelska.
Ingår i: Procedia Computer Science. - : Elsevier BV. - 1877-0509. ; 196, s. 990-998
  • Konferensbidrag (refereegranskat)
Abstract Ämnesord
Stäng  
  • involvement (ECI) is a project delivery method where the goal is to include construction knowledge into the design phase. This is done by procuring the contractor during the design phase of a project. There are different approaches to which time the contractor is introduced. This research paper aims to investigate the optimal time for contractors to enter infrastructure projects. In order to do this, an empirical study was conducted, where interviews were held with nine representatives from an ongoing ECI project in Sweden. The studied project was procured by the Swedish Transport Administration, and the contractor entered the project at the beginning of the design phase, before a land acquisition plan had been developed. This is the first time in Sweden that a contractor has been procured this early in a road project. The findings from the interviews show that responsibility, understanding, innovation, risk management, relationship-building and implementation are the aspects that have been affected due to ECI. By analyzing and discussing the results, it was concluded that involving the contractor as early as in the studied case has been beneficial, and that involving the contractor as early as possible in infrastructure project is favorable.

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Infrastrukturteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Infrastructure Engineering (hsv//eng)

Nyckelord

timing
collaborative management method
ECI

Publikations- och innehållstyp

kon (ämneskategori)
ref (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy