SwePub
Tyck till om SwePub Sök här!
Sök i LIBRIS databas

  Utökad sökning

WFRF:(Löfberg N.)
 

Sökning: WFRF:(Löfberg N.) > Optimal phasor meas...

Optimal phasor measurement unit placement for numerical observability in the presence of conventional measurements using semi-definite programming

Korres, George N. (författare)
National Technical University of Athens, Greece
Manousakis, Nikolaos M. (författare)
National Technical University of Athens, Greece
Xygkis, Themistoklis C. (författare)
National Technical University of Athens, Greece
visa fler...
Löfberg, Johan (författare)
Linköpings universitet,Reglerteknik,Tekniska fakulteten
visa färre...
 (creator_code:org_t)
2015-11
2015
Engelska.
Ingår i: IET Generation, Transmission & Distribution. - : INST ENGINEERING TECHNOLOGY-IET. - 1751-8687 .- 1751-8695. ; 9:15, s. 2427-2436
  • Tidskriftsartikel (refereegranskat)
Abstract Ämnesord
Stäng  
  • This study presents a new approach for optimal placement of synchronised phasor measurement units (PMUs) to ensure complete power system observability in the presence of non-synchronous conventional measurements and zero injections. Currently, financial or technical restrictions prohibit the deployment of PMUs on every bus, which in turn motivates their strategic placement across the power system. PMU allocation is optimised here based on measurement observability criteria for achieving solvability of the power system state estimation. Most of the previous work has proposed topological observability based methods for optimal PMU placement (OPP), which may not always ensure numerical observability required for successful execution of state estimation. The proposed OPP method finds out the minimum number and the optimal locations of PMUs required to make the power system numerically observable. The problem is formulated as a binary semi-definite programming (BSDP) model, with binary decision variables, minimising a linear objective function subject to linear matrix inequality observability constraints. The BSDP problem is solved using an outer approximation scheme based on binary integer linear programming. The developed method is conducted on IEEE standard test systems. A large-scale system with 3120 buses is also analysed to exhibit the applicability of proposed model to practical power system cases.

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Elektroteknik och elektronik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Electrical Engineering, Electronic Engineering, Information Engineering (hsv//eng)

Nyckelord

phasor measurement; numerical analysis; state estimation; linear matrix inequalities; integer programming; linear programming; synchronised phasor measurement units; power system observability; power system state estimation; optimal PMU placement; OPP method; binary semidefinite programming model; BSDP model; linear matrix inequality; binary integer linear programming

Publikations- och innehållstyp

ref (ämneskategori)
art (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy