Badush Dam : A Unique Case of Flood Wave Retention Dams Uncertain Future and Problematic Geology

Adamo, Nasrat (författare)
Private Consultant Engineering, Norrköping, Sweden
Al-Ansari, Nadhir, 1947- (författare)
Luleå tekniska universitet,Geoteknologi
Sissakian, Varoujan (författare)
University of Kurdistan, H awler, Iraq
visa fler...
Laue, Jan (författare)
Luleå tekniska universitet,Geoteknologi
Knutsson, Sven, 1948- (författare)
Luleå tekniska universitet,Geoteknologi
visa färre...
 (creator_code:org_t)
USA : Scientific Research Publishing, 2019
2019
Engelska.
Ingår i: Engineering. - USA : Scientific Research Publishing. - 1947-3931 .- 1947-394X. ; 11:4, s. 189-205
  • Tidskriftsartikel (refereegranskat)
Abstract Ämnesord
Stäng  
  • Badush Dam is a partially completed dam and a unique case of flood reten- tion dams. Its intended main function is to perform flood protection once in its lifetime; that is if Mosul Dam would collapse. In such a case, the Badush dam would temporarily store the whole flood wave and route it safely to the downstream. For this end, the bulk of the reservoir is left dry, while the re- maining  volume  at  the  lower  part  which  is  intended  for  power  eneration does  not  give  an  economic  justification  for  building  the  full  height  of  the dam. The short duration of the intended use as a protection dam has led to relaxing many design assumptions which have raised concerns over the dam integrity.  The  current  controversy  rages  now  over  whether  to  continue  the construction of the dam as it was first designed or to change all that in view of the similar site geology of Mosul Dam. Mosul dam foundations suffer at the moment from the severe continuous dissolution of the soluble materials in its foundation  leading  to  continued  maintenance  grouting  of  that  foundation. This paper gives an overview of the history of Badush dam, its current design and what new equirements which are needed if it is to replace Mosul Damitself.

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Geoteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Geotechnical Engineering (hsv//eng)

Nyckelord

Badush Dam
Mosul Dam
Flood Retention Dam Dry Dam
Foundation
Soil Mechanics
Geoteknik

Publikations- och innehållstyp

ref (ämneskategori)
art (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy