Träfflista för sökning "WFRF:(AlNasseri Hammad Abdullah) "

Sökning: WFRF:(AlNasseri Hammad Abdullah)

  • Resultat 1-6 av 6
Sortera/gruppera träfflistan
   
NumreringReferensOmslagsbildHitta
1.
  • AlNasseri, Hammad Abdullah, et al. (författare)
  • A taxonomy of planning and scheduling methods to support their more efficient use in construction project management
  • 2016
  • Ingår i: Journal of Engineering, Design and Technology. - Bingley : Emerald Group Publishing Limited. - 1726-0531 .- 1758-8901. ; 14:3, s. 580-601
  • Tidskriftsartikel (refereegranskat)abstract
    • Purpose: The implementation and control processes of project planning and scheduling involve a wide range of methods and tools. Despite the development and modification and integration of the project management theory with newer scheduling approaches in particular, practitioners’ views on the efficiency and effectiveness of these methods and tools differ. This situation can be attributed in part to a lack of understanding of the most appropriate basis for implementing these methods and tools. This study, therefore, aims to overcome this deficiency by conceptualizing and adopting a taxonomy of planning and scheduling methods.Design/methodology/approach: The study is based on a review and discourse analysis of the literature covering a large number of theoretical and empirical studies. The underlying theories of various planning and scheduling methods were analyzed with respect to the taxonomy criteria adopted in the study.Findings: Using the taxonomy, the key characteristics of planning and scheduling methods considered in this study were identified and interpreted. These included concepts and theories; key features; suitability and usability; and benefits and limitations. Overall, the findings suggest that project managers should consider taxonomy as a support tool for selecting and prioritizing the most appropriate method or combination of methods for managing their projects. Recommendations include the need for more advanced or multi-dimensional taxonomies to cope with the diversity of project type and size.Originality/value: The results of the study allow project managers to improve their current practices by utilizing taxonomy when considering the implementation of planning and scheduling methods. Moreover, taxonomy can be considered as a tool to promote learning on the part of those less experienced in planning and scheduling. Taxonomy can be considered as an initial platform for further research in this area. © 2016, © Emerald Group Publishing Limited.
  •  
2.
  •  
3.
  • AlNasseri, Hammad Abdullah, et al. (författare)
  • Towards a Taxonomy of Planning and Scheduling Methods in the Context of Construction Management.
  • 2013
  • Ingår i: [Host publication title missing]. - Trondheim : Akademika forlag. - 9788232102730 ; , s. 570-581
  • Konferensbidrag (refereegranskat)abstract
    • Planning and scheduling are considered as one of the most difficult but most important processes from perspectives of project management. These processes involve implementation of a widerange of planning methods used by different organizations with various levels of planning knowledge. The planning methods for scheduling can be classified as traditional methods (e.g. line of balance, Gantt chart and critical path) and modern methods (e.g. last planner and critical chain). Over time these methods had advanced from paper based to computer based. However, some project planners still prefer using the traditional methods despite other new alternatives. Users of those methods have different perspectives about the efficiency and effectiveness of the different planning methods used to manage different projects. Evidences from the secondary data found from extensive literatures have been used to assess the planning and scheduling methods mentioned above. A taxonomy describing each of the method in terms of their theories, key features, application areas, benefits and limitations is presented. The preliminary outcome of this paper may provide a tool to aid organizations in selecting and prioritizing the most appropriate methods to be developed and implemented in planning and scheduling of their projects. It also initializes a theoretical base for more rapid taxonomy studies on the use of different planning and scheduling approaches. As an overall, the present paper reminds practitioners of common ground about its important insights on how such taxonomy studies have potential to make scope of those methods and tools clearer, especially when they compare among them within the same application contexts.
  •  
4.
  •  
5.
  • AlNasseri, Hammad Abdullah (författare)
  • Understanding Applications of Project Planning and Scheduling in Construction Projects
  • 2015
  • Doktorsavhandling (övrigt vetenskapligt/konstnärligt)abstract
    • Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide construction projects appear to give insufficient attention to effective management and definition of project planning, including preplanning stages. Indeed, some planning issues have been completely overlooked, resulting in unsuccessful project performance. There is a lack of knowledge of, and understanding about, the significance of applications of project planning and scheduling theory in construction projects. Thus, improving such knowledge should be incorporated with new management strategies or tools to improve organizational learning and integration in the context of project planning and scheduling. This implies a need to assess project stakeholders’ understanding on the application of project planning and scheduling theories to practice. The main aim was to study and describe project stakeholders’ perspectives regarding a set of identified criteria comprising aspects assumed to be significant in successful project planning and scheduling. The main research question was developed as follows: What level of understanding do project stakeholders have about the application of project planning and scheduling theories in practices of construction projects? This key question is divided into a number of specific questions concerned with various aspects of project planning and scheduling. Three different questionnaire surveys were considered and designed in order to collect and analyse data relevant to the empirical studies presented and discussed under the scope of this thesis. The study context is Oman. The thesis is based on a summary of five appended papers, of which four represent empirical survey studies. The results form the basis of discussions and reflections, and the four key factors identified are: (1) highlighting management tools needed to improve organizational knowledge and understanding of project planning theories and methods; (2) paying particular consideration to the significant factors (enablers and barriers) impacting project planning and scheduling; (3) identifying project management roles and organizational behaviour in planning and scheduling; and (4) increasing project stakeholders’ awareness of front-end planning for a more successful project execution.
  •  
6.
  • ALNASSERI, HAMMAD ABDULLAH, et al. (författare)
  • Understanding management roles and organisational behaviours in planning and scheduling based on construction projects in Oman
  • 2016
  • Ingår i: Journal of Construction in Developing Countries. - : Penerbit Universiti Sains Malaysia. - 1823-6499 .- 2180-4222. ; 21:1, s. 1-18
  • Tidskriftsartikel (refereegranskat)abstract
    • There are many challenges associated with the construction processes of planning and scheduling. These challenges are relevant to all project parties or stakeholders and therefore management roles or organisational behaviours of those parties have to be properly considered and assessed. With this in mind, this study is aimed at assessing practitioners' perspectives on the current significance and applicability of a set of criteria or factors concerned with management roles and organisational behaviours of the different parties based on construction projects in Oman. The study has adopted a quantitative approach in which a questionnaire-based survey was chosen and conducted to gather responses from construction projects in Oman. A total of 67 valid responses were analysed based on the rankings and means of the respondents' perspectives on the significance and applicability of the identified factors to current practice. The overall findings indicated that all investigated factors should be critically considered as equally important to the development process of planning and scheduling. Nevertheless, the findings implied that a management priority should be given to the most important factors significantly affecting project planning and scheduling. The study provides some useful recommendations on how to improve project management roles and organisational behaviours in planning and scheduling on the part of key project parties.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-6 av 6

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy