1.
  • Neri, L, et al. (författare)
  • Improved design of proton source and low energy beam transport line for European Spallation Source.
  • 2014
  • Ingår i: Review of Scientific Instruments. - : AIP Publishing. - 1089-7623 .- 0034-6748. ; 85:2
  • Tidskriftsartikel (refereegranskat)abstract
    • The design update of the European Spallation Source (ESS) accelerator is almost complete and the construction of the prototype of the microwave discharge ion source able to provide a proton beam current larger than 70 mA to the 3.6 MeV Radio Frequency Quadrupole (RFQ) started. The source named PS-ESS (Proton Source for ESS) was designed with a flexible magnetic system and an extraction system able to merge conservative solutions with significant advances. The ESS injector has taken advantage of recent theoretical updates and new plasma diagnostics tools developed at INFN-LNS (Laboratori Nazionali del Sud, Istituto Nazionale di Fisica Nucleare). The design strategy considers the PS-ESS and the low energy beam transport line as a whole, where the proton beam behaves like an almost neutralized non-thermalized plasma. Innovative solutions have been used as hereinafter described. Thermo-mechanical optimization has been performed to withstand the chopped beam and the misaligned focused beam over the RFQ input collimator; the results are reported here.
  •  
2.
  • Ciavola, G., et al. (författare)
  • Status report of the MS-ECRIS construction
  • 2007
  • Ingår i: High Energy Physics & Nuclear Physics - Chinese Edition. - 0254-3052. ; 31, s. 13-17
  • Tidskriftsartikel (refereegranskat)abstract
    • The design of each component of the Multipurpose Superconducting ECR Ion Source (MS-ECRIS) has been completed and some items are ready. The magnets and the cryostat are under construction at ACCEL and the commissioning is scheduled for March 2007. The mechanical have been optimized and their construction is under way, the microwave system is under refurbishment and the 65kV power supply is available and upgraded for afterglow operations. Pumping and extraction system were adapted to the EIS testbench of GSI Darmstadt. The description of,each part will be given in the paper along with a schedule of the forthcoming development and experiments.
  •  
3.
  • Ciavola, G., et al. (författare)
  • Status report of the multipurpose superconducting electron cyclotron resonance ion source
  • 2008
  • Ingår i: Review of Scientific Instruments. - : AIP Publishing. - 0034-6748 .- 1089-7623. ; 79:2, s. 02A326-
  • Tidskriftsartikel (refereegranskat)abstract
    • Intense heavy ion beam production with electron cyclotron resonance (ECR) ion sources is a common requirement for many of the accelerators under construction in Europe and elsewhere. An average increase of about one order of magnitude per decade in the performance of ECR ion sources was obtained up to now since the time of pioneering experiment of R. Geller at CEA, Grenoble, and this trend is not deemed to get the saturation at least in the next decade, according to the increased availability of powerful magnets and microwave generators. Electron density above 1013 cm(-3) and very high current of multiply charged ions are expected with the use of 28 GHz microwave heating and of an adequate plasma trap, with a B-minimum shape, according to the high B mode concept [S. Gammino and G. Ciavola, Plasma Sources Sci. Technol. 5, 19 (1996)]. The MS-ECRIS ion source has been designed following this concept and its construction is underway at GSI, Darmstadt. The project is the result of the cooperation of nine European institutions with the partial funding of EU through the sixth Framework Programme. The contribution of different institutions has permitted to build in 2006-2007 each component at high level of expertise. The description of the major components will be given in the following with a view on the planning of the assembly and commissioning phase to be carried out in fall 2007. An outline of the experiments to be done with the MS-ECRIS source in the next two years will be presented.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-3 av 3

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy