SwePub
Sök i SwePub databas

  Utökad sökning

Träfflista för sökning "WFRF:(Damm Lars Ola) "

Sökning: WFRF:(Damm Lars Ola)

  • Resultat 1-10 av 21
Sortera/gruppera träfflistan
   
NumreringReferensOmslagsbildHitta
1.
  • Damm, Lars-Ola, et al. (författare)
  • A model for software rework reduction through a combination of anomaly metrics
  • 2008
  • Ingår i: Journal of Systems and Software. - : Elsevier. - 0164-1212 .- 1873-1228. ; 81:11, s. 1968-1982
  • Tidskriftsartikel (refereegranskat)abstract
    • Analysis of anomalies reported during testing of a project can tell a lot about how well the processes and products work. Still, organizations rarely use anomaly reports for more than progress tracking although projects commonly spend a significant part of the development time on finding and correcting faults. This paper presents an anomaly metrics model that organizations can use for identifying improvements in the development process, i.e. to reduce the cost and lead-time spent on rework-related activities and to improve the quality of the delivered product. The model is the result of a four year research project performed at Ericsson. © 2008 Elsevier Inc. All rights reserved.
  •  
2.
  •  
3.
  •  
4.
  • Damm, Lars-Ola, et al. (författare)
  • Determining the Improvement Potential of a Software Development Organization through Fault Analysis : A Method and a Case Study
  • 2004
  • Konferensbidrag (refereegranskat)abstract
    • Successful software process improvement depends on the ability to analyze past projects and determine which parts of the process that could become more efficient. One typical data source is the faults that are reported during product development. From an industrial need, this paper provides a solution based on a measure called faults-slip-through, i.e. the measure tells which faults that should have been found in earlier phases. From the measure, the improvement potential of different parts of the development process is estimated by calculating the cost of the faults that slipped through the phase where they should have been found. The usefulness of the method was demonstrated by applying it on two completed development projects at Ericsson AB. The results show that the implementation phase had the largest improvement potential since it caused the largest faults-slip-through cost to later phases, i.e. 81 and 84 percent of the total improvement potential in the two studied projects.
  •  
5.
  •  
6.
  •  
7.
  •  
8.
  •  
9.
  •  
10.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-10 av 21

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy