SwePub
Tyck till om SwePub Sök här!
Sök i SwePub databas

  Utökad sökning

Träfflista för sökning "WFRF:(Dubrovskiy A.) "

Sökning: WFRF:(Dubrovskiy A.)

  • Resultat 1-5 av 5
Sortera/gruppera träfflistan
   
NumreringReferensOmslagsbildHitta
1.
  • Constance, B., et al. (författare)
  • Experimental Verification of the CLIC Two-Beam Acceleration Technology in CTF3
  • 2013
  • Ingår i: IPAC 2013: Proceedings of the 4th International Particle Accelerator Conference. - 9783954501229 ; , s. 1436-1438
  • Konferensbidrag (refereegranskat)abstract
    • The Compact Linear Collider international collaboration is pursuing an extensive R&D program towards a multi- TeV electron-positron collider. In particular, the development of two-beam acceleration technology is the focus of the CLIC test facility CTF3. In this paper we summarise the most recent results obtained at CTF3: The results of the studies on the drive beam generation are presented, the achieved two beam acceleration performance is reported and the measured breakdown rates and related observations are summarised. The stability of the deceleration process performed over 12 subsequent modules and a comparison of the obtained results with the theoretical expectations are discussed. We also outline the future experimental program.
  •  
2.
  •  
3.
  •  
4.
  • Adli, E., et al. (författare)
  • X-band rf power production and deceleration in the two-beam test stand of the Compact Linear Collider test facility
  • 2011
  • Ingår i: Physical Review Special Topics - Accelerators and Beams. - 1098-4402. ; 14:8, s. 081001-
  • Tidskriftsartikel (refereegranskat)abstract
    • We discuss X-band rf power production and deceleration in the two-beam test stand of the CLIC test facility at CERN. The rf power is extracted from an electron drive beam by a specially designed power extraction structure. In order to test the structures at high-power levels, part of the generated power is recirculated to an input port, thus allowing for increased deceleration and power levels within the structure. The degree of recirculation is controlled by a splitter and phase shifter. We present a model that describes the system and validate it with measurements over a wide range of parameters. Moreover, by correlating rf power measurements with the energy lost by the electron beam, as measured in a spectrometer placed after the power extraction structure, we are able to identify system parameters, including the form factor of the electron beam. The quality of the agreement between model and reality gives us confidence to extrapolate the results found in the present test facility towards the parameter regime of CLIC.
  •  
5.
  • Dubrovskiy, A., et al. (författare)
  • Review of the drive beam stabilization in the CLIC test facility CTF3
  • 2013
  • Ingår i: IPAC 2013: Proceedings of the 4th International Particle Accelerator Conference. - 9783954501229 ; , s. 2666-2668
  • Konferensbidrag (refereegranskat)abstract
    • CTF3 is a Test Facility focusing on beam-based studies of the key concepts of the Compact Linear Collider CLIC. Over the past several years many aspects of the CLIC two-beam acceleration scheme were studied in CTF3, including the crucial issue of drive beam stability. The main sources of drifts and instabilities have been identified and mitigated, helping to improve the machine performance and showing significant progress towards the experimental demonstration of the very stringent requirements on current, energy and phase stability needed in CLIC. In this paper, the more effective techniques and feed-backs are summarized. The latest measurements on beam stability are reported and their relevance to CLIC is discussed.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-5 av 5

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy