1. |
- Ljung Aust, Mikael, 1973, et al.
(författare)
-
Final measures (Deliverable 5.5)
- 2020
-
Rapport (övrigt vetenskapligt/konstnärligt)abstract
- The main objective of WP5 has been to run a set of field trials with naïve users (i.e. not experts involved in the development of the measures) for all nudging and coaching measures developed in WP2-4. Then, given the outcome of the field trials, the task has been to analyse which impacts these measures may have on road safety along with the cost of implementing them in vehicle fleets and/or infrastructure. All these activities have taken place in Tasks 5.4 (Data collection) and 5.6 (Data analysis).
|
|