SwePub
Sök i SwePub databas

  Utökad sökning

Träfflista för sökning "WFRF:(Oganessian Y.T.) "

Sökning: WFRF:(Oganessian Y.T.)

  • Resultat 1-4 av 4
Sortera/gruppera träfflistan
   
NumreringReferensOmslagsbildHitta
1.
  • Fomichev, A. S., et al. (författare)
  • Status of the ACCULINNA-2 project at FLNR
  • 2012
  • Ingår i: Journal of Physics: Conference Series. - : IOP Publishing. - 1742-6588 .- 1742-6596. ; 337:1, s. Art. no. 012025-
  • Konferensbidrag (refereegranskat)abstract
    • The project of a new and more powerful in-flight fragment separator ACCULINNA-2 at U-400M cyclotron in FLNR, JINR planned to build in addition to the existing separator ACCULINNA is presented. The new separator will provide high intensity RIBs in the lowest energy range (5÷50 MeV/nucleon) which is attainable for in-flight separators. The possibilities for the astrophysics studies at the proposed device are presented. ACCULINNA-2 separator is planned to be constructed in the years 2010-2015. The current status of the project is reported.
  •  
2.
  • Fomichev, A. S., et al. (författare)
  • The Suggested New Fragment Separator ACCULINNA-2
  • 2010
  • Ingår i: Acta Physica Polonica, Series B.. - 1509-5770 .- 0587-4254. ; 41:2, s. 475-480
  • Tidskriftsartikel (refereegranskat)abstract
    • We present new project of fragment separator ACCULINNA-2 that is being planned to be constructed in Flerov Laboratory of Nuclear Reaction, JINR. The ACCULINNA-2 facility is not, intended to compete with the, new large in-flight RIB facilities. It, should complement the existing/constructed facilities in certain fields. Namely, ACCULINNA-2 should provide high intensity RIBs in the lowest energy range attainable for in-flight separators.
  •  
3.
  • Krupko, S. A., et al. (författare)
  • Fragment separator ACCULINNA-2
  • 2010
  • Ingår i: AIP Conference Proceedings. - : AIP. - 1551-7616 .- 0094-243X. - 9780735407688 ; 1224, s. 516-521
  • Konferensbidrag (övrigt vetenskapligt/konstnärligt)
  •  
4.
  • Krupko, S. A., et al. (författare)
  • The status of new fragment separator ACCULINNA-2 project and the first day experiments
  • 2014
  • Ingår i: EPJ Web of Conferences. - : EDP Sciences. - 2101-6275 .- 2100-014X. ; 66
  • Konferensbidrag (refereegranskat)abstract
    • The new facility fragment separator ACCULINNA-2 will be put into operation at the beginning of 2015 in FLNR JINR. The new separator is destined to add considerably to the studies of drip-line nuclei performed with the use of variety of direct reactions known to be distinctive to the 15 - 50 MeV/amu exotic secondary RIBs. Intense beams provided by the U-400M cyclotron will ensure the achievement of this objective. In addition to the RIB separation accomplished by means of the dipole-wedge-dipole selection, the addition of a zero-degree dipole magnet setup is foreseen. A long (13 m) straight section will provide precise time-of-flight measurements. © Owned by the authors, published by EDP Sciences, 2014.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-4 av 4

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy