SwePub
Sök i SwePub databas

  Extended search

Träfflista för sökning "id:"swepub:oai:lup.lub.lu.se:bd71cd5a-5df2-4f30-a3d0-e3a27d2ac851" "

Search: id:"swepub:oai:lup.lub.lu.se:bd71cd5a-5df2-4f30-a3d0-e3a27d2ac851"

  • Result 1-1 of 1
Sort/group result
   
EnumerationReferenceCoverFind
1.
  • Alme, J., et al. (author)
  • RCU2-The ALICE TPC readout electronics consolidation for Run2
  • 2013
  • In: Journal of Instrumentation. - 1748-0221. ; 8
  • Journal article (peer-reviewed)abstract
    • This paper presents the solution for optimization of the ALICE TPC readout for running at full energy in the Run2 period after 2014. For the data taking with heavy ion beams an event readout rate of 400 Hz with a low dead time is envisaged for the ALICE central barrel detectors during these three years. A new component, the Readout Control Unit 2 (RCU2), is being designed to increase the present readout rate by a factor of up to 2.6. The immunity to radiation induced errors will also be significantly improved by the new design.
  •  
Skapa referenser, mejla, bekava och länka
  • Result 1-1 of 1

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Close

Copy and save the link in order to return to this view