SwePub
Sök i SwePub databas

  Utökad sökning

Träfflista för sökning "(WFRF:(Kester O.)) srt2:(2015-2017)"

Sökning: (WFRF:(Kester O.)) > (2015-2017)

  • Resultat 1-4 av 4
Sortera/gruppera träfflistan
   
NumreringReferensOmslagsbildHitta
1.
  • Lestinsky, M., et al. (författare)
  • Physics book: CRYRING@ESR
  • 2016
  • Ingår i: European Physical Journal: Special Topics. - : Springer Science and Business Media LLC. - 1951-6401 .- 1951-6355. ; 225:5, s. 797-882
  • Forskningsöversikt (refereegranskat)abstract
    • The exploration of the unique properties of stored and cooled beams of highly-charged ions as provided by heavy-ion storage rings has opened novel and fascinating research opportunities in the realm of atomic and nuclear physics research. Since the late 1980s, pioneering work has been performed at the CRYRING at Stockholm (Abrahamsson et al. 1993) and at the Test Storage Ring (TSR) at Heidelberg (Baumann et al. 1988). For the heaviest ions in the highest charge-states, a real quantum jump was achieved in the early 1990s by the commissioning of the Experimental Storage Ring (ESR) at GSI Helmholtzzentrum für Schwerionenforschung (GSI) in Darmstadt (Franzke 1987) where challenging experiments on the electron dynamics in the strong field regime as well as nuclear physics studies on exotic nuclei and at the borderline to atomic physics were performed. Meanwhile also at Lanzhou a heavy-ion storage ring has been taken in operation, exploiting the unique research opportunities in particular for medium-heavy ions and exotic nuclei (Xia et al. 2002).
  •  
2.
  • Lestinsky, M., et al. (författare)
  • CRYRING@ESR: present status and future research
  • 2015
  • Ingår i: Physica Scripta. - : IOP Publishing. - 1402-4896 .- 0031-8949. ; 2015:T166
  • Konferensbidrag (refereegranskat)abstract
    • The former storage ring CRYRING has been shipped from the Manne Siegbahn Laboratory in Stockholm to Darmstadt as a Swedish in-kind contribution to FAIR. At its new location downstream of ESR all ion species presently accessible in ESR can be transferred to CRYRING, in which ions with rigidities between 1.44 and 0.054 Tm can be stored. The original Swedish layout has been modified by reconfiguring the sequence of straight sections and by slightly increasing the circumference to ESR/2. Ions can be injected from ESR or from an independent 300 keV/u RFQ test injector. The instrumentation of the ring includes an RF drift tube system for acceleration and deceleration (1 T s(-1), with a possibility for an upgrade to 7 T s(-1)), electron cooling, a free experimental section, and both fast and slow extraction of ions. We report on the present progress of this project, give a prospective timeline, and summarize the new research which will be enabled by this project. First beam for commissioning of the storage ring is expected for 2015, final bakeout to restore ultrahigh vacuum conditions in 2016 and ion beams injected through ESR in similar to 2017.
  •  
3.
  • Lestinsky, M., et al. (författare)
  • CRYRING@ESR: present status and future research
  • 2015
  • Ingår i: Physica Scripta. - 0031-8949 .- 1402-4896. ; T166
  • Tidskriftsartikel (refereegranskat)abstract
    • The former storage ring CRYRING has been shipped from the Manne Siegbahn Laboratory in Stockholm to Darmstadt as a Swedish in-kind contribution to FAIR. At its new location downstream of ESR all ion species presently accessible in ESR can be transferred to CRYRING, in which ions with rigidities between 1.44 and 0.054 Tm can be stored. The original Swedish layout has been modified by reconfiguring the sequence of straight sections and by slightly increasing the circumference to ESR/2. Ions can be injected from ESR or from an independent 300 keV/u RFQ test injector. The instrumentation of the ring includes an RF drift tube system for acceleration and deceleration (1 T s(-1), with a possibility for an upgrade to 7 T s(-1)), electron cooling, a free experimental section, and both fast and slow extraction of ions. We report on the present progress of this project, give a prospective timeline, and summarize the new research which will be enabled by this project. First beam for commissioning of the storage ring is expected for 2015, final bakeout to restore ultrahigh vacuum conditions in 2016 and ion beams injected through ESR in similar to 2017.
  •  
4.
  • Shipman, R., et al. (författare)
  • Data processing pipeline for Herschel HIFI
  • 2017
  • Ingår i: Astronomy and Astrophysics. - : EDP Sciences. - 0004-6361 .- 1432-0746. ; 608, s. A49-
  • Tidskriftsartikel (refereegranskat)abstract
    • Context. The HIFI instrument on the Herschel Space Observatory performed over 9100 astronomical observations, almost 900 of which were calibration observations in the course of the nearly four-year Herschel mission. The data from each observation had to be converted from raw telemetry into calibrated products and were included in the Herschel Science Archive. Aims. The HIFI pipeline was designed to provide robust conversion from raw telemetry into calibrated data throughout all phases of the HIFI missions. Pre-launch laboratory testing was supported as were routine mission operations. Methods. A modular software design allowed components to be easily added, removed, amended and / or extended as the understanding of the HIFI data developed during and after mission operations. Results. The HIFI pipeline processed data from all HIFI observing modes within the Herschel automated processing environment as well as within an interactive environment. The same software can be used by the general astronomical community to reprocess any standard HIFI observation. The pipeline also recorded the consistency of processing results and provided automated quality reports. Many pipeline modules were in use since the HIFI pre-launch instrument level testing. Conclusions. Processing in steps facilitated data analysis to discover and address instrument artefacts and uncertainties. The availability of the same pipeline components from pre-launch throughout the mission made for well-understood, tested, and stable processing. A smooth transition from one phase to the next significantly enhanced processing reliability and robustness.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-4 av 4

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy