1. |
|
|
2. |
|
|
3. |
- Munch-Petersen, C., et al.
(författare)
-
Concrete strategy for the Oresund Tunnel
- 1997
-
Ingår i: Betonwerk und Fertigteil-Technik / Concrete Precasting Plant and Technology. - 0373-4331. ; 63:11, s. 44-54
-
Tidskriftsartikel (övrigt vetenskapligt/konstnärligt)abstract
- This paper gives a short review of the most requirements for the concrete to be used for the 3.510 m long immersed tunnel from Amager (outside Copenhagen Airport) to an artificial double island south of Saltholm (in the middle of Oresund). The basis for the requirements is shortly commented.
|
|