1.
  •  
2.
  • Alinaitwe, Henry, et al. (författare)
  • Innovation Barriers and Enablers that Affect Productivity in Uganda Building Industry
  • 2007
  • Ingår i: Journal of Construction in Developing Countries. - Penang : Penerbit Universiti Sains Malaysia / Universiti Sains Malaysia Press. - 1823-6499 .- 2180-4222. ; 12:1, s. 59-75
  • Tidskriftsartikel (refereegranskat)abstract
    • Abstract: The construction industry has of recent been blamed for lack of innovation. Lack of innovation in the industry is believed to be responsible for the decreasing or stagnant levels of productivity in comparison with other industries. This paper reviews the major barriers and enables to innovation in general. Propositions were made about the factors that affect innovation in the construction industry which were then formulated into a questionnaire. A survey was made on building contractors in Uganda, a developing country, targeting those with financial strength, large in size, and with high capacity to carry out big projects. The identified factors were then ranked and correlated. The level of training in science, engineering and technical education, and the level of research and development at the industry level are looked at as the greatest innovation enablers in building that will drive forward labour productivity. The size of the domestic market and the level of security are the worst innovation barriers that lead to low productivity in the building industry in Uganda. Contractors, policy makers and the government should address the identified factors in order to improve productivity.
  •  
3.
  • Andersson, Niclas, et al. (författare)
  • Construction Innovation Systems - A Sector Approach
  • 2005
  • Ingår i: Understanding the Construction Business and Companies in the New Millennium. - Helsinki : VTT – Technical Research Centre of Finland & RIL – Association of Finnish Civil Engineers. - 9525004627 ; , s. 203-213
  • Konferensbidrag (refereegranskat)abstract
    • Recent studies depict the general need to increase and improve innovation in the construction industry. Innovation processes are traditionally described and analysed either on a macro level or a micro level. Production in construction is basically project oriented, as opposed to manufacturing industries for which most of these theories are developed. It is not fully sufficient to study innovation from a micro or a macro level due to the effects of the project orientation and the large number of actors in the construction industry. The objective of this paper is to present a model of the construction innovation systems from a sector systems approach. The study rests upon findings in the area of innovation systems in general and construction innovation systems in particular on one hand and construction sector systems analysis on the other. This paper presents arguments for the development of activity based innovation systems at a construction sector level.
  •  
4.
  •  
5.
  • Hansson, Bengt, et al. (författare)
  • Byggprocessforum för en effektivare process
  • 2005
  • Rapport (övrigt vetenskapligt/konstnärligt)abstract
    • The Construction Process Forum was initiated by the Construction Council. The Construction Council is an organisation which supports cooperation between universities and the construction industry. The Construction Process Forum was formed through that chosen key persons were asked to come up with suggestions on how to create a more effective construction process plus how to improve the image of construction. The aim was also to increase the awareness among the participants of Construction Process Forum. This report narrates the result of one years work within the Construction Process Forum. The focus of this first year was the construction site and the changes needed of the construction process to create better conditions for the construction site. The Construction Process Forum ended with the formulation of a plan of action for the development of construction.
  •  
6.
  • Olander, Stefan, 1971-, et al. (författare)
  • Differences in implementation and effects of the public procurement act in the EU construction sector
  • 2008
  • Ingår i: CME 25 Conference Construction Management and Economics. - 9780415460590 ; , s. 267-276
  • Konferensbidrag (refereegranskat)abstract
    • All member countries in the EU must follow the given directive for public procurement that has been decided upon. The purpose of the directive is to ensure a sufficient public procurement and a sound use of public resources. However, knowledge about the implementation and effects of the directive is limited. One clear indication is that the effects vary between different countries in the EU. A preliminary study of the implementation of the public procurement act in Sweden and Denmark for the construction sector has been conducted, with the aim of obtaining knowledge of how and why implementation and effects vary. One distinction is that the number of appeals concerning public procurement is higher in Sweden than in Denmark that might depend on a different implementation of the directive, mainly because Sweden has added amendment to the directive while Denmark has not. The variation of implementing the directive between member countries may have negative impact upon the opportunities of obtaining the best possible service and technical solution in the public procurement process.
  •  
7.
  • Olander, Stefan, et al. (författare)
  • Differences in implementation and effects of the public procurement act in the EU construction sector
  • 2007
  • Konferensbidrag (refereegranskat)abstract
    • All member countries in the EU must follow the given directive for public procurement that has been decided upon. The purpose of the directive is to ensure a sufficient public procurement and a sound use of public resources. However, knowledge about the implementation and effects of the directive is limited. One clear indication is that the effects vary between different countries in the EU. A preliminary study of the implementation of the public procurement act in Sweden and Denmark for the construction sector has been conducted, with the aim of obtaining knowledge of how and why implementation and effects vary. One distinction is that the number of appeals concerning public procurement is higher in Sweden than in Denmark that might depend on a different implementation of the directive, mainly because Sweden has added amendment to the directive while Denmark has not. The variation of implementing the directive between member countries may have negative impact upon the opportunities of obtaining the best possible service and technical solution in the public procurement process.
  •  
8.
  •  
9.
  • Pemsel, Sofia, et al. (författare)
  • Managing end user requirements in construction projects
  • 2009
  • Ingår i: Proceedings of 5th Nordic Conference on Construction Economics and Organisation. ; 1, s. 44-55, s. 44-55
  • Konferensbidrag (refereegranskat)abstract
    • Purpose The research presented is the initial part of a project with the aim of increasing the use of end-user requirement through out the construction process. This initial part maps how Swedish real estate companies manage end-user requirements and evaluate the outcome. Methodological approach The focus of the study was on methods for capturing and managing end-user requirements and for measuring their satisfaction with the outcome. The study was conducted as a desktop study using literature databases and through interviews with key personnel from 12 different companies; from housing, office and school real estate management to health care facilities management. Results The literature review showed that there are a number of different methods that could be used for parts, but that there exist no method that cover the whole process. There are different ways to combine methods for achieving an end-user focus throughout the project. The Swedish real estate companies did, in most cases, measure end-user satisfaction; not in relation to construction projects, but on a general level. Feeding back the knowledge, gained from the evaluations, into construction projects were found difficult and thereby not done. The companies were all interested in new ways of working and thought that it would improve there business. Status The paper is based on work made in the spring of 2008 this initial part of the study is almost finished and will be completely finished by the time of full paper submission. Contribution The work identifies the problems of keeping an end-user approach through the whole building cycle; from briefing to evaluating the building in use. The paper gives a collection of different methods and indicators and how these could be combined to create greater value for the end-users as well as the state of the art of work methods in practice in Sweden.
  •  
10.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-10 av 22

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy