SwePub
Sök i LIBRIS databas

  Utökad sökning

id:"swepub:oai:DiVA.org:ltu-4655"
 

Sökning: id:"swepub:oai:DiVA.org:ltu-4655" > (2015) > Optimisation of mai...

Optimisation of maintenance track possession time : A tamping case study

Famurewa, Stephen Mayowa (författare)
Luleå tekniska universitet,Drift, underhåll och akustik
Xin, Tao (författare)
Luleå tekniska universitet,Drift, underhåll och akustik
Rantatalo, Matti (författare)
Luleå tekniska universitet,Drift, underhåll och akustik
visa fler...
Kumar, Uday (författare)
Luleå tekniska universitet,Drift, underhåll och akustik
visa färre...
 (creator_code:org_t)
2013-07-26
2015
Engelska.
Ingår i: Proceedings of the Institution of mechanical engineers. Part F, journal of rail and rapid transit. - : SAGE Publications. - 0954-4097 .- 2041-3017. ; 229:1, s. 42726-
  • Tidskriftsartikel (refereegranskat)
Abstract Ämnesord
Stäng  
  • Optimum allocation and efficient utilisation of track possession time are becoming important topics in railway infrastructure management due to increasing capacity demands. This development and other requirements of modern infrastructure management necessitate the improvement of planning and scheduling of large-scale maintenance activities such as tamping. It is therefore necessary to develop short-, medium- and long-term plans for performing tamping on a network or track section within a definite time horizon. To this end, two key aspects of infrastructure maintenance planning are considered in this paper, deterioration modelling and scheduling optimisation. An exponential deterioration function is applied to model the geometry quality of a series of 200 m segments of a 130 km line section, and an empirical model for recovery after tamping intervention is developed. These two models are subsequently used to generate a methodology to optimise a schedule for tamping intervention by minimising the total cost of intervention including the cost of track possession while geometry quality is ascertained to be within a desirable limit. The modelling considers two types of tamping interventions, preventive and corrective, with different intervention limits and tamping machines. The result of this paper suggests a tamping plan which will lead to optimum allocation of track possession time while maintaining the track geometry quality within specified limits.

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Annan samhällsbyggnadsteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Other Civil Engineering (hsv//eng)

Nyckelord

Drift och underhållsteknik
Operation and Maintenance

Publikations- och innehållstyp

ref (ämneskategori)
art (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy