SwePub
Sök i SwePub databas

  Utökad sökning

Träfflista för sökning "WFRF:(Fedotova S.) srt2:(2015)"

Sökning: WFRF:(Fedotova S.) > (2015)

  • Resultat 1-3 av 3
Sortera/gruppera träfflistan
   
NumreringReferensOmslagsbildHitta
1.
  • Bibikova, E. V., et al. (författare)
  • The early crust of the Volgo-Uralian segment of the East European Craton: Isotope-geochronological zirconology of metasedimentary rocks of the Bolshecheremshanskaya Formation and their Sm-Nd model ages
  • 2015
  • Ingår i: Stratigraphy and Geological Correlation. - 0869-5938. ; 23:1, s. 1-23
  • Tidskriftsartikel (refereegranskat)abstract
    • We present the results of isotope-geochronological study of metasedimentary rocks of the Bolshecheremshanskaya Formation of the Volgo-Uralian segment of the East European Craton carried out to identify their protoliths. 16 samples of high-alumina gneisses from well cores were studied using the Sm-Nd isotope method and T-Nd(DM) model ages. Accessory zircons were selected from rocks with the most ancient model ages (more 3.2 Ga) in three wells: Minnibaevskaya 20000, Novo-Elkhovskaya 20009, and Zai-Karatayskaya 12930 in South Tatarstan. The isotope U-Pb dating of 200 zircon grains was performed on a Cameca 1280 NORDSIM secondary ion mass spectrometer at the Natural History Museum (Stockholm, Sweden). The most applicable sites for analysis of zircon crystals were pre-selected based on cathodoluminescence images. The analytical results demonstrate the diversity of zircon groups in age from 3.8 to 2.6 Ga and together with geochemical features of metasedimentary rocks of the Bolshecheremshanskaya Formation suggest the heterogeneous composition and age of provenance areas under denudation. Occurrence of Eoarchean and Paleoarchean zircons in the clastic material of the protolith of the Bolshecheremshanskaya gneisses indicates the existence of Early Archean crustal terrains in Volgo-Uralia.
  •  
2.
  • Lestinsky, M., et al. (författare)
  • CRYRING@ESR: present status and future research
  • 2015
  • Ingår i: Physica Scripta. - 0031-8949 .- 1402-4896. ; T166
  • Tidskriftsartikel (refereegranskat)abstract
    • The former storage ring CRYRING has been shipped from the Manne Siegbahn Laboratory in Stockholm to Darmstadt as a Swedish in-kind contribution to FAIR. At its new location downstream of ESR all ion species presently accessible in ESR can be transferred to CRYRING, in which ions with rigidities between 1.44 and 0.054 Tm can be stored. The original Swedish layout has been modified by reconfiguring the sequence of straight sections and by slightly increasing the circumference to ESR/2. Ions can be injected from ESR or from an independent 300 keV/u RFQ test injector. The instrumentation of the ring includes an RF drift tube system for acceleration and deceleration (1 T s(-1), with a possibility for an upgrade to 7 T s(-1)), electron cooling, a free experimental section, and both fast and slow extraction of ions. We report on the present progress of this project, give a prospective timeline, and summarize the new research which will be enabled by this project. First beam for commissioning of the storage ring is expected for 2015, final bakeout to restore ultrahigh vacuum conditions in 2016 and ion beams injected through ESR in similar to 2017.
  •  
3.
  • Lestinsky, M., et al. (författare)
  • CRYRING@ESR: present status and future research
  • 2015
  • Ingår i: Physica Scripta. - : IOP Publishing. - 1402-4896 .- 0031-8949. ; 2015:T166
  • Konferensbidrag (refereegranskat)abstract
    • The former storage ring CRYRING has been shipped from the Manne Siegbahn Laboratory in Stockholm to Darmstadt as a Swedish in-kind contribution to FAIR. At its new location downstream of ESR all ion species presently accessible in ESR can be transferred to CRYRING, in which ions with rigidities between 1.44 and 0.054 Tm can be stored. The original Swedish layout has been modified by reconfiguring the sequence of straight sections and by slightly increasing the circumference to ESR/2. Ions can be injected from ESR or from an independent 300 keV/u RFQ test injector. The instrumentation of the ring includes an RF drift tube system for acceleration and deceleration (1 T s(-1), with a possibility for an upgrade to 7 T s(-1)), electron cooling, a free experimental section, and both fast and slow extraction of ions. We report on the present progress of this project, give a prospective timeline, and summarize the new research which will be enabled by this project. First beam for commissioning of the storage ring is expected for 2015, final bakeout to restore ultrahigh vacuum conditions in 2016 and ion beams injected through ESR in similar to 2017.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-3 av 3

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy