1. |
- Abe, K., et al.
(författare)
-
J-PARC Neutrino Beamline Upgrade Technical Design Report
- 2019
-
Rapport (refereegranskat)abstract
- In this document, technical details of the upgrade plan of the J-PARC neutrino beamline for the extension of the T2K experiment are described. T2K has proposed to accumulate data corresponding to 2×1022 protons-on-target in the next decade, aiming at an initial observation of CP violation with 3σ or higher significance in the case of maximal CP violation. Methods to increase the neutrino beam intensity, which are necessary to achieve the proposed data increase, are described.
|
|
2. |
|
|
3. |
|
|
4. |
|
|