Sökning: id:"swepub:oai:DiVA.org:ltu-10616" >
Initial order quant...
Initial order quantities
-
- Axsäter, Sven (författare)
- Lund University,Lunds universitet,Luleå tekniska universitet,Produktionsekonomi,Institutionen för maskinvetenskaper,Institutioner vid LTH,Lunds Tekniska Högskola,Production Management,Department of Mechanical Engineering Sciences,Departments at LTH,Faculty of Engineering, LTH
-
(creator_code:org_t)
- 1989
- 1989
- Engelska.
-
Ingår i: Engineering Costs and Production Economics. - 0167-188X .- 1878-4011. ; 15, s. 307-315
- Relaterad länk:
-
https://urn.kb.se/re...
-
visa fler...
-
https://doi.org/10.1...
-
https://lup.lub.lu.s...
-
visa färre...
Abstract
Ämnesord
Stäng
- The paper shows how optimal lot sizes are determined in an initial transient phase where the needed lead time may not be available in the production of a batch. It is assumed that the sales are lost. The transient problem is due to the finite production rate. A case is also considered when the constant demand starts suddenly and production is not started in advance. It is assumed that backlogging is not allowed
Ämnesord
- TEKNIK OCH TEKNOLOGIER -- Maskinteknik -- Produktionsteknik, arbetsvetenskap och ergonomi (hsv//swe)
- ENGINEERING AND TECHNOLOGY -- Mechanical Engineering -- Production Engineering, Human Work Science and Ergonomics (hsv//eng)
- TEKNIK OCH TEKNOLOGIER -- Samhällsbyggnadsteknik -- Transportteknik och logistik (hsv//swe)
- ENGINEERING AND TECHNOLOGY -- Civil Engineering -- Transport Systems and Logistics (hsv//eng)
Nyckelord
- Industriell logistik
- Industrial Logistics
Publikations- och innehållstyp
- ref (ämneskategori)
- art (ämneskategori)
Hitta via bibliotek
Till lärosätets databas