Sökning: onr:"swepub:oai:DiVA.org:mdh-18228" >
Estimation of produ...
Estimation of productivity increase for timing analysis tool chains
-
- Merriam, N. (författare)
- GLIWA GmbH embedded systems, Germany
-
- Lisper, Björn (författare)
- Mälardalens högskola,Inbyggda system,IS
-
(creator_code:org_t)
- 2012-10-12
- 2013
- Engelska.
-
Ingår i: International Journal on Software Tools for Technology Transfer. - : Springer Science and Business Media LLC. - 1433-2779 .- 1433-2787. ; 15:1, s. 65-84
- Relaterad länk:
-
https://urn.kb.se/re...
-
visa fler...
-
https://doi.org/10.1...
-
visa färre...
Abstract
Ämnesord
Stäng
- Within the scope of the ALL-TIMES project, not only were tool interfaces designed and implemented but also new, powerful timing analysis methodologies constructed. To gauge the effectiveness of these results we used a number of methods to assess the productivity increase that would be achieved by introducing the new techniques. We collect and report on the conclusions of these assessments. © 2012 Springer-Verlag.
Nyckelord
- Productivity increase
- Timing analysis
- Timing tool chain
- Timing tools
Publikations- och innehållstyp
- ref (ämneskategori)
- art (ämneskategori)
Hitta via bibliotek
Till lärosätets databas