SwePub
Sök i LIBRIS databas

  Utökad sökning

onr:"swepub:oai:research.chalmers.se:7a4ed803-ca6a-4c45-bf27-2bde4212b135"
 

Sökning: onr:"swepub:oai:research.chalmers.se:7a4ed803-ca6a-4c45-bf27-2bde4212b135" > Learning from demon...

  • Koch, Christian,1958Chalmers tekniska högskola,Chalmers University of Technology (författare)

Learning from demonstration? Developing construction for sustainability

  • Artikel/kapitelEngelska2014

Förlag, utgivningsår, omfång ...

  • Bentham Science Publishers Ltd.2014
  • electronicrdacarrier

Nummerbeteckningar

  • LIBRIS-ID:oai:research.chalmers.se:7a4ed803-ca6a-4c45-bf27-2bde4212b135
  • https://doi.org/10.2174/1874836801408010009DOI
  • https://research.chalmers.se/publication/216410URI

Kompletterande språkuppgifter

  • Språk:engelska
  • Sammanfattning på:engelska

Ingår i deldatabas

Klassifikation

  • Ämneskategori:art swepub-publicationtype
  • Ämneskategori:ref swepub-contenttype

Anmärkningar

  • Demonstration projects are often used in the building sector to provide a basis for using new processes and/or products. The climate change agenda implies that construction is not only required to deliver value for the customer, cost reductions and efficiency but also sustainable buildings. This paper reports on an early demonstration project, the building of a passive house dormitory in the Central Region of Denmark in 2006-2009. The project was supposed to deliver value, lean design, prefabrication, quality in sustainability, certification according to German standards for passive houses, and micro combined heat and power using hydrogen. Using sociological and business economic theories of innovation, the paper discusses how early movers of innovation tend to obtain only partial success when demonstrating their products and often feel obstructed by minor details. The empirical work encompasses both an evaluation of the design and construction process as well as a post-occupancy evaluation. Process experiences include the use of a multidisciplinary competence group and performance measurement. The commencement of the project was enthusiastic, but it was forced into more traditional forms of control, driven by such challenges as complying with cost goals, the need to choose a German prefab supplier, and local contractors. Energy calculations, indoor climate, issues related to square meter requirements, and the hydrogen element became problematic. The aim to obtain passive house certification prevailed over realizing a good indoor climate, which included sufficient heating. Project management must be able to handle quantitative complexity where simple issues add up to major challenges. © Koch and Bertelsen; Licensee Bentham Open.

Ämnesord och genrebeteckningar

Biuppslag (personer, institutioner, konferenser, titlar ...)

  • Bertelsen, N.H.Aalborg Universitet,Aalborg University (författare)
  • Chalmers tekniska högskolaAalborg Universitet (creator_code:org_t)

Sammanhörande titlar

  • Ingår i:Open Construction and Building Technology Journal: Bentham Science Publishers Ltd.8:1, s. 9-171874-8368

Internetlänk

Hitta via bibliotek

Till lärosätets databas

Hitta mer i SwePub

Av författaren/redakt...
Koch, Christian, ...
Bertelsen, N.H.
Om ämnet
TEKNIK OCH TEKNOLOGIER
TEKNIK OCH TEKNO ...
och Samhällsbyggnads ...
Artiklar i publikationen
Open Constructio ...
Av lärosätet
Chalmers tekniska högskola

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy