SwePub
Sök i SwePub databas

  Extended search

Träfflista för sökning "WFRF:(Dette K.) "

Search: WFRF:(Dette K.)

  • Result 1-7 of 7
Sort/group result
   
EnumerationReferenceCoverFind
1.
  • Aad, G., et al. (author)
  • 2016
  • In: Journal of High Energy Physics. - : Springer. - 1029-8479 .- 1126-6708. ; :1
  • Journal article (peer-reviewed)
  •  
2.
  • Aad, G., et al. (author)
  • 2015
  • In: Physical Review D. Particles and fields. - : American Physics Society. - 0556-2821 .- 1089-4918. ; 92:11
  • Journal article (peer-reviewed)
  •  
3.
  • Aad, G., et al. (author)
  • 2015
  • In: Journal of High Energy Physics. - : Springer. - 1029-8479 .- 1126-6708. ; :12
  • Journal article (peer-reviewed)
  •  
4.
  • Aad, G., et al. (author)
  • 2015
  • In: Physical Review D. Particles and fields. - : American Physical Society. - 0556-2821 .- 1089-4918. ; 92:9
  • Journal article (peer-reviewed)
  •  
5.
  • Aad, G., et al. (author)
  • 2016
  • In: Physical Review D. Particles and fields. - : American Physical Society. - 0556-2821 .- 1089-4918. ; 93:1
  • Journal article (peer-reviewed)
  •  
6.
  • Poley, L., et al. (author)
  • The ABC130 barrel module prototyping programme for the ATLAS strip tracker
  • 2020
  • In: Journal of Instrumentation. - : IOP PUBLISHING LTD. - 1748-0221. ; 15:9
  • Journal article (peer-reviewed)abstract
    • For the Phase-II Upgrade of the ATLAS Detector [1], its Inner Detector, consisting of silicon pixel, silicon strip and transition radiation sub-detectors, will be replaced with an all new 100% silicon tracker, composed of a pixel tracker at inner radii and a strip tracker at outer radii. The future ATLAS strip tracker will include 11,000 silicon sensor modules in the central region (barrel) and 7,000 modules in the forward region (end-caps), which are foreseen to be constructed over a period of 3.5 years. The construction of each module consists of a series of assembly and quality control steps, which were engineered to be identical for all production sites. In order to develop the tooling and procedures for assembly and testing of these modules, two series of major prototyping programs were conducted: an early program using readout chips designed using a 250 nm fabrication process (ABCN-250) [2, 3] and a subsequent program using a follow-up chip set made using 130 nm processing (ABC130 and HCC130 chips). This second generation of readout chips was used for an extensive prototyping program that produced around 100 barrel-type modules and contributed significantly to the development of the final module layout. This paper gives an overview of the components used in ABC130 barrel modules, their assembly procedure and findings resulting from their tests.
  •  
7.
  • Dette, HH, et al. (author)
  • Application of prototype flume tests for beach nourishment assessment
  • 2002
  • In: Coastal Engineering. - 0378-3839. ; 47:2, s. 137-177
  • Journal article (peer-reviewed)abstract
    • The development of underwater profiles and sand losses from the dune respectively the beach by various water level and wave conditions has been studied worldwide in large wave flumes since 1955. Virtually all major results collected over the last decades are documented and described in this paper. Moreover, to this overview results from the MAST III-SAFE experiments, carried out in the Grosser Wellenkanal (GWK) in Hannover, are summarized and discussed in more detail. The tests were focused on beach and dune stability under given conditions with normal and raised water levels. The results are concentrated on surf zone profiles, beach slope and erosion. Furthermore, dune erosion with and without barriers, built into the dune face, and perched surf zone by means of an underwater sill were investigated.
  •  
Skapa referenser, mejla, bekava och länka
  • Result 1-7 of 7

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Close

Copy and save the link in order to return to this view