Cover-Time Planning/Takt Planning : A technique for Materials Requirement and Production Planning

Segerstedt, Anders (author)
Luleå tekniska universitet,Industriell Ekonomi
 (creator_code:org_t)
Elsevier, 2017
2017
English.
In: International Journal of Production Economics. - : Elsevier. - 0925-5273 .- 1873-7579. ; 194, s. 25-31
  • Journal article (peer-reviewed)
Abstract Subject headings
Close  
  • Cover-Time Planning, or Takt Planning, is presented. It is a system for calculating material requirements and start of purchases and production. Requested production rates of sales items, or alternative prefabricated modules in stock, are “broken down”, exploded, to create the need for components, for all underlying items (articles) in the Bill of Material. Inventory and already ordered replenishments are compared with the item's desired production rate. How long already made actions are expected to cover the desired expected sales and production rates is compared with the item's lead time; if a forward future shortage is likely the article is signalled for a refill. With examples is described how make-to-order production is done easily. The method is a type of reorder point system, but with time instead of quantity as decision variable. Unlike a traditional reorder point system increases and decreases of production can be planned. Future work load in various production sections can be estimated. It is described how an “Available-to-promise”-system should be designed and used. Cover-Time Planning (CTP) is a complete alternative to Materials Requirements Planning (MRP). CTP responds faster than MRP, since MRP for each structural level uses a batch size to "break down" and to magnify the need at the underlying level. In the end a large material acquisition needs to be ordered maybe just to build a single end item. CTP uses the end item requirement rates on all structural levels shifted with the lead times, when customer demand changes, the entire production chain react simultaneously

Subject headings

TEKNIK OCH TEKNOLOGIER  -- Maskinteknik -- Produktionsteknik, arbetsvetenskap och ergonomi (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Mechanical Engineering -- Production Engineering, Human Work Science and Ergonomics (hsv//eng)

Keyword

Industrial Logistics
Industriell logistik

Publication and Content Type

ref (subject category)
art (subject category)

Find in a library

To the university's database

  • 1 of 1
  • Previous record
  • Next record
  •    To hitlist

Find more in SwePub

By the author/editor
Segerstedt, Ande ...
About the subject
ENGINEERING AND TECHNOLOGY
ENGINEERING AND ...
and Mechanical Engin ...
and Production Engin ...
Articles in the publication
International Jo ...
By the university
Luleå University of Technology

Search outside SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Close

Copy and save the link in order to return to this view