Optimal time for contractors to enter infrastructure projects
-
- Antonsson, Freddy (author)
- Chalmers tekniska högskola,Chalmers University of Technology
-
- Lindvall, David (author)
- Chalmers tekniska högskola,Chalmers University of Technology
-
- Lagerkvist, Johan, 1983 (author)
- Chalmers tekniska högskola,Chalmers University of Technology
-
show more...
-
- Rempling, Rasmus, 1976 (author)
- Chalmers tekniska högskola,Chalmers University of Technology
-
show less...
-
(creator_code:org_t)
- Elsevier BV, 2021
- 2021
- English.
-
In: Procedia Computer Science. - : Elsevier BV. - 1877-0509. ; 196, s. 990-998
- Related links:
-
https://research.cha... (primary) (free)
-
show more...
-
https://doi.org/10.1...
-
https://doi.org/10.1...
-
https://research.cha...
-
show less...
Abstract
Subject headings
Close
- involvement (ECI) is a project delivery method where the goal is to include construction knowledge into the design phase. This is done by procuring the contractor during the design phase of a project. There are different approaches to which time the contractor is introduced. This research paper aims to investigate the optimal time for contractors to enter infrastructure projects. In order to do this, an empirical study was conducted, where interviews were held with nine representatives from an ongoing ECI project in Sweden. The studied project was procured by the Swedish Transport Administration, and the contractor entered the project at the beginning of the design phase, before a land acquisition plan had been developed. This is the first time in Sweden that a contractor has been procured this early in a road project. The findings from the interviews show that responsibility, understanding, innovation, risk management, relationship-building and implementation are the aspects that have been affected due to ECI. By analyzing and discussing the results, it was concluded that involving the contractor as early as in the studied case has been beneficial, and that involving the contractor as early as possible in infrastructure project is favorable.
Subject headings
- TEKNIK OCH TEKNOLOGIER -- Samhällsbyggnadsteknik -- Infrastrukturteknik (hsv//swe)
- ENGINEERING AND TECHNOLOGY -- Civil Engineering -- Infrastructure Engineering (hsv//eng)
Keyword
- timing
- collaborative management method
- ECI