SwePub
Sök i LIBRIS databas

  Extended search

onr:"swepub:oai:research.chalmers.se:ea9c25d5-a2f5-4941-8acd-f064be7206a8"
 

Search: onr:"swepub:oai:research.chalmers.se:ea9c25d5-a2f5-4941-8acd-f064be7206a8" > Aircraft Assembly R...

  • 1 of 1
  • Previous record
  • Next record
  •    To hitlist
  • Ng, Amos H. C.,1970-Högskolan i Skövde,Institutionen för ingenjörsvetenskap,Forskningsmiljön Virtuell produkt- och produktionsutveckling,Produktion och Automatiseringsteknik, Production and Automation Engineering / Virtuella fabriker VF-KDO, Virtual Factories of the Future (author)

Aircraft Assembly Ramp-Up Planning Using a Hybrid Simulation-Optimization Approach

  • Article/chapterEnglish2020

Publisher, publication year, extent ...

  • IEEE,2020
  • printrdacarrier

Numbers

  • LIBRIS-ID:oai:DiVA.org:his-19651
  • https://urn.kb.se/resolve?urn=urn:nbn:se:his:diva-19651URI
  • https://doi.org/10.1109/WSC48552.2020.9383887DOI

Supplementary language notes

  • Language:English
  • Summary in:English

Part of subdatabase

Classification

  • Subject category:ref swepub-contenttype
  • Subject category:kon swepub-publicationtype

Notes

  • © 2020 IEEE
  • Assembly processes have the most influencing and long-term impact on the production volume and cost in the aerospace industry. One of the most crucial factors in aircraft assembly lines design during the conceptual design phase is ramp-up planning that synchronizes the production rates at the globally dispersed facilities. Inspired by a pilot study performed with an aerospace company, this paper introduces a hybrid simulation-optimization approach for addressing an assembly production chain ramp-up problem that takes into account: (1) the interdependencies of the ramp-up profiles between final assembly lines and its upstream lines; (2) workforce planning with various learning curves; (3) inter-plant buffer and lead-time optimization, in the problem formulation. The approach supports the optimization of the ramp-up profile that minimizes the times the aircraft assemblies stay in the buffers and simultaneously attains zero backlog. It also generates the required simulation-optimization data for supporting the decision-making activities in the industrialization projects. 

Subject headings and genre

Added entries (persons, corporate bodies, meetings, titles ...)

  • Bernedixen, JacobHögskolan i Skövde,Institutionen för ingenjörsvetenskap,Forskningsmiljön Virtuell produkt- och produktionsutveckling,Produktion och Automatiseringsteknik, Production and Automation Engineering(Swepub:his)sveb (author)
  • Andersson, Martin,1981-Högskolan i Skövde,Institutionen för ingenjörsvetenskap,Produktion och Automatiseringsteknik, Production and Automation Engineering(Swepub:his)anrt (author)
  • Bandaru, Sunith,1984-Högskolan i Skövde,Institutionen för ingenjörsvetenskap,Forskningsmiljön Virtuell produkt- och produktionsutveckling,Virtuella fabriker VF-KDO,Produktion och Automatiseringsteknik, Production and Automation Engineering(Swepub:his)bans (author)
  • Lezama, ThomasModelling Simulation Airbus Group, Toulouse, France (author)
  • Högskolan i SkövdeInstitutionen för ingenjörsvetenskap (creator_code:org_t)

Related titles

  • In:Proceedings - Winter Simulation Conference: IEEE, s. 3045-305697817281949989781728195001

Internet link

Find in a library

To the university's database

  • 1 of 1
  • Previous record
  • Next record
  •    To hitlist

Search outside SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Close

Copy and save the link in order to return to this view