SwePub
Sök i SwePub databas

  Utökad sökning

Träfflista för sökning "WFRF:(Garoby R.) "

Sökning: WFRF:(Garoby R.)

  • Resultat 1-3 av 3
Sortera/gruppera träfflistan
   
NumreringReferensOmslagsbildHitta
1.
  • Edgecock, T. R., et al. (författare)
  • High intensity neutrino oscillation facilities in Europe
  • 2013
  • Ingår i: Physical Review Special Topics - Accelerators and Beams. - : American Physical Society. - 1098-4402. ; 16:2, s. 021002-
  • Tidskriftsartikel (refereegranskat)abstract
    • The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the Frejus tunnel. The second facility is the Neutrino Factory, in which the neutrinos come from the decay of mu(+) and mu(-) beams in a storage ring. The far detector in this case is a 100 kt magnetized iron neutrino detector at a baseline of 2000 km. The third option is a Beta Beam, in which the neutrinos come from the decay of beta emitting isotopes, in particular He-6 and Ne-18, also stored in a ring. The far detector is also the MEMPHYS detector in the Frejus tunnel. EUROnu has undertaken conceptual designs of these facilities and studied the performance of the detectors. Based on this, it has determined the physics reach of each facility, in particular for the measurement of CP violation in the lepton sector, and estimated the cost of construction. These have demonstrated that the best facility to build is the Neutrino Factory. However, if a powerful proton driver is constructed for another purpose or if the MEMPHYS detector is built for astroparticle physics, the Super Beam also becomes very attractive.
  •  
2.
  •  
3.
  • Lindroos, M., et al. (författare)
  • ESS progressing into construction
  • 2016
  • Ingår i: IPAC 2016 - Proceedings of the 7th International Particle Accelerator Conference. - 9783954501472 ; , s. 4266-4270
  • Konferensbidrag (refereegranskat)abstract
    • The construction of the European Spallation Source, ESS, started in summer 2014. At the site in Lund, the accelerator tunnel will be completed at the time of IPAC16, while prototyping and manufacturing or preparations for manpower contributions are going on in more 23 laboratories distributed over the 12 European countries collaborating on the accelerator project. Major technical milestones have been reached include the testing of superconducting cavity prototypes of two families to values above design gradients, the first ESS modulator has been tested to 90 kV and the first klystron prototype has been received in April 2016. Equally important developments are taking place at many partner laboratories. The presentation will summarize the status of the ESS accelerator project by the time of IPAC16.
  •  
Skapa referenser, mejla, bekava och länka
  • Resultat 1-3 av 3

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy