SwePub
Sök i LIBRIS databas

  Utökad sökning

onr:"swepub:oai:research.chalmers.se:f7ab8b34-5a02-4f14-8de8-953d7f6a5c89"
 

Sökning: onr:"swepub:oai:research.chalmers.se:f7ab8b34-5a02-4f14-8de8-953d7f6a5c89" > Techno-Economic Ass...

Techno-Economic Assessment of Different Heat Exchangers for CO2 Capture

Aromada, Solomon Aforkoghene (författare)
Universitetet i Søraust-Noreg (USN) Kongsberg,University of South-Eastern Norway (USN) Kongsberg
Eldrup, Nils Henrik (författare)
Universitetet i Søraust-Noreg (USN) Kongsberg,University of South-Eastern Norway (USN) Kongsberg,SINTEF industri,SINTEF Industry
Normann, Fredrik, 1982 (författare)
Chalmers tekniska högskola,Chalmers University of Technology
visa fler...
Oi, Lars Erik (författare)
Universitetet i Søraust-Noreg (USN) Kongsberg,University of South-Eastern Norway (USN) Kongsberg
visa färre...
 (creator_code:org_t)
2020-11-30
2020
Engelska.
Ingår i: Energies. - : MDPI AG. - 1996-1073 .- 1996-1073. ; 13:23
  • Tidskriftsartikel (refereegranskat)
Abstract Ämnesord
Stäng  
  • We examined the cost implications of selecting six different types of heat exchangers as the lean/rich heat exchanger in an amine-based CO2 capture process. The difference in total capital cost between different capture plant scenarios due to the different costs of the heat exchangers used as the lean/rich heat exchanger, in each case, is in millions of Euros. The gasketed-plate heat exchanger (G-PHE) saves significant space, and it saves considerable costs. Selecting the G-PHE instead of the shell and tube heat exchangers (STHXs) will save euro33 million-euro39 million in total capital cost (CAPEX), depending on the type of STHX. About euro43 million and euro2 million in total installed costs (CAPEX) can be saved if the G-PHE is selected instead of the finned double-pipe heat exchanger (FDP-HX) or welded-plate heat exchanger, respectively. The savings in total annual cost is also in millions of Euros/year. Capture costs of euro5/tCO(2)-euro6/tCO(2) can be saved by replacing conventional STHXs with the G-PHE, and over euro6/tCO(2) in the case of the FDP-HX. This is significant, and it indicates the importance of clearly stating the exact type and not just the broad classification of heat exchanger used as lean/rich heat exchanger. This is required for cost estimates to be as accurate as possible and allow for appropriate comparisons with other studies. Therefore, the gasketed-plate heat exchanger is recommended to save substantial costs. The CO2 capture costs of all scenarios are most sensitive to the steam cost. The plate and frame heat exchangers (PHEs) scenario's capture cost can decline from about euro77/tCO(2) to euro59/tCO(2) or rise to euro95/tCO(2).

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Maskinteknik -- Energiteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Mechanical Engineering -- Energy Engineering (hsv//eng)
TEKNIK OCH TEKNOLOGIER  -- Naturresursteknik -- Annan naturresursteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Environmental Engineering -- Other Environmental Engineering (hsv//eng)
TEKNIK OCH TEKNOLOGIER  -- Naturresursteknik -- Energisystem (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Environmental Engineering -- Energy Systems (hsv//eng)

Nyckelord

carbon capture
Aspen HYSYS
heat exchanger
CO2
sensitivity
energy cost
capture cost
simulation

Publikations- och innehållstyp

art (ämneskategori)
ref (ämneskategori)

Hitta via bibliotek

  • Energies (Sök värdpublikationen i LIBRIS)

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy