SwePub
Sök i LIBRIS databas

  Extended search

WFRF:(Rintala Jukka)
 

Search: WFRF:(Rintala Jukka) > (1999) > Biological nitrogen...

  • 1 of 1
  • Previous record
  • Next record
  •    To hitlist
  • Pelkonen, MarkkuLaboratory of Environmental Engineering, Helsinki University of Technology (author)

Biological nitrogen removal from landfill leachate : A pilot-scale study

  • Article/chapterEnglish1999

Publisher, publication year, extent ...

  • Wiley,1999
  • printrdacarrier

Numbers

  • LIBRIS-ID:oai:DiVA.org:ltu-12013
  • https://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-12013URI
  • https://doi.org/10.1034/j.1399-3070.1999.00068.xDOI

Supplementary language notes

  • Language:English
  • Summary in:English

Part of subdatabase

Classification

  • Subject category:ref swepub-contenttype
  • Subject category:art swepub-publicationtype

Notes

  • Upprättat; 1999; 20150522 (andbra)
  • A pilot-scale two-stage process including an anaerobic pretreatment (up-flow anaerobic sludge blanket, UASB) unit and a pre-denitrification activated sludge process was studied for treating leachates from a municipal landfill (waste aged 4 to 5 years, area 2.5 ha) and from a windrow composting area (1 ha). A single-stage pilot process was used for nitrification studies. The leachate characteristics were as follows: COD 740 to 2400 mg l-1 (chemical oxygen demand), BOD7 (biochemical oxygen demand) approximately 1000 mg l-1, N(tot) 40 to 120 mg l-1 and the temperature was between 2 and 21°C. The results show that 45 to 50 COD removal could be achieved in the UASB reactor even at temperatures below 10°C. The activated sludge process was operated with a 1.1 to 2.2 d hydraulic retention time and at between 8 and 21°C. The removal efficiencies were 80 to 90 for COD, over 98 for BOD7, over 90 for NH4-N and over 70 for N(tot). The dependence of denitrification efficiency on leachate biodegradable COD fraction and COD to N ratio was evaluated. Overall treatment efficiencies were good and applicable for design purposes. The total costs were estimated for a full scale pre-denitrification process at FIM 10 to 20 m-3 and FIM 50 to 90 (kg N removed)-1 (3.5 to 7 DM m-3 and 17 to 30 DM [kg N removed]-1) for a landfill representing circumstances in Southern Finland with an annual average flow of 50 m3 d-1.

Subject headings and genre

Added entries (persons, corporate bodies, meetings, titles ...)

  • Kotro, MikkoNordic Envicon Oy, Helsinki University, Development Services (author)
  • Rintala, Jukka A.University of Jyväskylä, Department of Biology and Environmental Science (author)
  • Laboratory of Environmental Engineering, Helsinki University of TechnologyNordic Envicon Oy, Helsinki University, Development Services (creator_code:org_t)

Related titles

  • In:Waste Management & Research: Wiley17:6, s. 493-4970734-242X1096-36691399-3070

Internet link

Find in a library

To the university's database

  • 1 of 1
  • Previous record
  • Next record
  •    To hitlist

Find more in SwePub

By the author/editor
Pelkonen, Markku
Kotro, Mikko
Rintala, Jukka A ...
About the subject
ENGINEERING AND TECHNOLOGY
ENGINEERING AND ...
and Environmental En ...
and Other Environmen ...
Articles in the publication
Waste Management ...
By the university
Luleå University of Technology

Search outside SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Close

Copy and save the link in order to return to this view