SwePub
Sök i LIBRIS databas

  Extended search

id:"swepub:oai:DiVA.org:ltu-12633"
 

Search: id:"swepub:oai:DiVA.org:ltu-12633" > Augmented utilisati...

  • 1 of 1
  • Previous record
  • Next record
  •    To hitlist
  • Famurewa, Stephen MayowaLuleå tekniska universitet,Drift, underhåll och akustik (author)

Augmented utilisation of possession time : Analysis for track geometry maintenance

  • Article/chapterEnglish2016

Publisher, publication year, extent ...

  • 2015-05-08
  • SAGE Publications,2016
  • printrdacarrier

Numbers

  • LIBRIS-ID:oai:DiVA.org:ltu-12633
  • https://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-12633URI
  • https://doi.org/10.1177/0954409715583890DOI

Supplementary language notes

  • Language:English
  • Summary in:English

Part of subdatabase

Classification

  • Subject category:ref swepub-contenttype
  • Subject category:art swepub-publicationtype

Notes

  • Validerad; 2016; Nivå 2; 20150511 (andbra)
  • The demand for increased capacity on existing railway networks is a challenge for many Europe-based infrastructure managers; addressing this challenge requires augmented utilisation of track possession time. It is considered that large-scale maintenance tasks such as geometry maintenance can be improved; thus, reducing the on-track maintenance time and allowing more traffic. In this study, an analysis of track geometry maintenance was performed with the objective of reducing the required possession time. The procedure and models for planning and optimizing track geometry maintenance are presented. A statistical model that uses a simulation approach was used to determine the condition of the track geometry, and a schedule optimization problem was formulated to support intervention decisions and optimize the track possession time. The results of the case study show that optimizing the maintenance shift length and cycle length are opportunities to reduce the extent of track possession required for the maintenance of the track geometry. In addition, continuous improvement of the tamping process through lean analysis promises about a 45% reduction in the required possession time for a tamping cycle.

Subject headings and genre

Added entries (persons, corporate bodies, meetings, titles ...)

  • Juntti, UllaLuleå Railway Research Centre (author)
  • Nissen, ArneTrafikverket (author)
  • Kumar, UdayLuleå tekniska universitet,Drift, underhåll och akustik(Swepub:ltu)uday (author)
  • Luleå tekniska universitetDrift, underhåll och akustik (creator_code:org_t)

Related titles

  • In:Proceedings of the Institution of mechanical engineers. Part F, journal of rail and rapid transit: SAGE Publications230:4, s. 1118-11300954-40972041-3017

Internet link

Find in a library

To the university's database

  • 1 of 1
  • Previous record
  • Next record
  •    To hitlist

Find more in SwePub

By the author/editor
Famurewa, Stephe ...
Juntti, Ulla
Nissen, Arne
Kumar, Uday
About the subject
ENGINEERING AND TECHNOLOGY
ENGINEERING AND ...
and Civil Engineerin ...
and Other Civil Engi ...
Articles in the publication
Proceedings of t ...
By the university
Luleå University of Technology

Search outside SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Close

Copy and save the link in order to return to this view