Search: WFRF:(Al Gburi Majid) >
Model for economic ...
Model for economic replacement time of mining production rigs including redundant rig costs
-
- Hamodi, Hussan (author)
- Luleå tekniska universitet,Drift, underhåll och akustik
-
- Lundberg, Jan (author)
- Luleå tekniska universitet,Drift, underhåll och akustik
-
- Al-Gburi, Majid (author)
- Luleå tekniska universitet,Byggkonstruktion och -produktion
-
show more...
-
- Ahmadi, Alireza (author)
- Luleå tekniska universitet,Drift, underhåll och akustik
-
- Ghodrati, Behzad (author)
- Luleå tekniska universitet,Drift, underhåll och akustik
-
show less...
-
(creator_code:org_t)
- 2015
- 2015
- English.
-
In: Journal of Quality in Maintenance Engineering. - 1355-2511 .- 1758-7832. ; 21:2, s. 207-226
- Related links:
-
https://urn.kb.se/re...
-
show more...
-
https://doi.org/10.1...
-
show less...
Abstract
Subject headings
Close
- Purpose - This paper presents a practical model to determine the economic replacement time (ERT) of production machines. The objective is to minimise the total cost of capital equipment, where total cost includes acquisition, operating, maintenance costs and costs related to the machine’s downtime. The costs related to the machine’s downtime are represented by the costs of using a redundant machine. Design/methodology/approach - Four years of cost data are collected. Data is analysed, practical optimisation model is developed and regression analysis is done to estimate the drilling rigs ERT. The artificial neural network (ANN) technique is used to identify the effect of factors influencing the ERT of the drilling rigs.Findings - The results show that the redundant rig cost has the largest impact on ERT, followed by acquisition, maintenance and operating costs. The study also finds that increasing redundant costs per hour have a negative effect on ERT, while decreases in other costs have a positive effect. Regression analysis shows a linear relationship between the cost factors and ERT. Practical implications - The proposed approach can be used by the decision maker in determining the economic replacement time of production machines which used in mining industry.Originality/value - The research proposed in this paper provides and develops an optimisation model for economic replacement time of mining machines. This research also identifies and explains the factors that have the largest impact on the production machine’s ERT. This model for estimating the ERT has never been studied on mining drilling rigs.Keywords Decision support model, Life cycle cost, Optimisation, Replacement timePaper type Research paper
Subject headings
- TEKNIK OCH TEKNOLOGIER -- Samhällsbyggnadsteknik -- Annan samhällsbyggnadsteknik (hsv//swe)
- ENGINEERING AND TECHNOLOGY -- Civil Engineering -- Other Civil Engineering (hsv//eng)
Keyword
- Drift och underhållsteknik
- Operation and Maintenance
Publication and Content Type
- ref (subject category)
- art (subject category)
Find in a library
To the university's database