An Integrated Environment–Cost–Time Optimisation Method for Construction Contractors Considering Global Warming

  • Article/chapterEnglish2018

Publisher, publication year, extent ...

  • 2018-11-14
  • MDPI,2018
  • printrdacarrier

Numbers

  • LIBRIS-ID:oai:DiVA.org:ltu-71814
  • https://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-71814URI
  • https://doi.org/10.3390/su10114207DOI

Supplementary language notes

  • Language:English
  • Summary in:English

Part of subdatabase

Classification

  • Subject category:ref swepub-contenttype
  • Subject category:art swepub-publicationtype

Notes

  • Validerad;2018;Nivå 2;2018-11-29 (svasva)
  • Construction contractors play a vital role in reducing the environmental impacts during the construction phase. To mitigate these impacts, contractors need to develop environmentally friendly plans that have optimal equipment, materials and labour configurations. However, construction plans with optimal environment may negatively affect the project cost and duration, resulting in dilemma for contractors on adopting low impacts plans. Moreover, the enumeration method that is usually used needs to assess and compare the performances of a great deal of scenarios, which seems to be time consuming for complicated projects with numerous scenarios. This study therefore developed an integrated method to efficiently provide contractors with plans having optimal environment-cost-time performances. Discrete-event simulation (DES) and particle swarm optimisation algorithms (PSO) are integrated through an iterative loop, which remarkably reduces the efforts on optimal scenarios searching. In the integrated method, the simulation module can model the construction equipment and materials consumption; the assessment module can evaluate multi-objective performances; and the optimisation module fast converges on optimal solutions. A prototype is developed and implemented in a hotel building construction. Results show that the proposed method greatly reduced the times of simulation compared with enumeration method. It provides the contractor with a trade-off solution that can average reduce 26.9% of environmental impact, 19.7% of construction cost, and 10.2% of project duration. The method provides contractors with an efficient and practical decision support tool for environmentally friendly planning.

Subject headings and genre

Added entries (persons, corporate bodies, meetings, titles ...)

  • Lu, WeizhuoLuleå tekniska universitet,Industriellt och hållbart byggande(Swepub:ltu)welu (author)
  • Chen, ShiweiLuleå tekniska universitet,Byggkonstruktion och brand,Department of Construction Management, Harbin Institute of Technology, Harbin, China(Swepub:ltu)shiche (author)
  • Wang, YaowuDepartment of Construction Management, Harbin Institute of Technology, Harbin, China (author)
  • Luleå tekniska universitetIndustriellt och hållbart byggande (creator_code:org_t)

Related titles

  • In:Sustainability: MDPI10:112071-1050

Internet link

Find in a library

To the university's database

Find more in SwePub

By the author/editor
Feng, Kailun, 19 ...
Lu, Weizhuo
Chen, Shiwei
Wang, Yaowu
About the subject
ENGINEERING AND TECHNOLOGY
ENGINEERING AND ...
and Civil Engineerin ...
and Infrastructure E ...
ENGINEERING AND TECHNOLOGY
ENGINEERING AND ...
and Civil Engineerin ...
and Construction Man ...
Articles in the publication
Sustainability
By the university
Luleå University of Technology

Search outside SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Close

Copy and save the link in order to return to this view