SwePub
Sök i LIBRIS databas

  Utökad sökning

WFRF:(Guan Nan)
 

Sökning: WFRF:(Guan Nan) > Fixed-Priority Mult...

Fixed-Priority Multiprocessor Scheduling : Critical Instant, Response Time and Utilization Bound

Guan, Nan (författare)
Uppsala universitet,Datorteknik
Yi, Wang (författare)
Uppsala universitet,Datorteknik
 (creator_code:org_t)
2012
2012
Engelska.
Ingår i: 2012 IEEE 26TH INTERNATIONAL PARALLEL AND DISTRIBUTED PROCESSING SYMPOSIUM WORKSHOPS & PHD FORUM (IPDPSW). - 9780769546766 ; , s. 2470-2473
  • Konferensbidrag (refereegranskat)
Abstract Ämnesord
Stäng  
  • The rapid development of multi-core processors leads to a constantly increasing trend of deploying real-time systems on multi-core platforms, to satisfy the dramatically increasing high-performance and low-power requirements. This trend demands effective and efficient multiprocessor real-time scheduling techniques. The uniprocessor scheduling problem has been well studied during the last 40 years. However the multiprocessor scheduling problem to map tasks onto parallel architectures is a much harder challenge. In this work, we study several fundamental problems in multiprocessor scheduling, namely the critical instant, bounded responsiveness, and utilization bound.

Publikations- och innehållstyp

ref (ämneskategori)
kon (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Hitta mer i SwePub

Av författaren/redakt...
Guan, Nan
Yi, Wang
Artiklar i publikationen
2012 IEEE 26TH I ...
Av lärosätet
Uppsala universitet

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy