Search: WFRF:(Hamid S. A.)
> (2020-2024) >
Impact of different...
-
Kahangi shahreza, SLund University,Lunds universitet,Avdelningen för Konstruktionsteknik,Institutionen för bygg- och miljöteknologi,Institutioner vid LTH,Lunds Tekniska Högskola,LTH profilområde: Cirkulär byggindustri,LTH profilområden,Division of Structural Engineering,Department of Building and Environmental Technology,Departments at LTH,Faculty of Engineering, LTH,LTH Profile Area: Circular Building Sector,LTH Profile areas,Faculty of Engineering, LTH
(author)
Impact of different water penetration criteria and cavity ventilation rates on the risk of mold growth in timber frame walls with brick veneer cladding
- Article/chapterEnglish2023
Publisher, publication year, extent ...
Numbers
-
LIBRIS-ID:oai:lup.lub.lu.se:0cdbadfb-6431-44d6-8c1d-27e3d6a42a60
-
https://lup.lub.lu.se/record/0cdbadfb-6431-44d6-8c1d-27e3d6a42a60URI
-
https://doi.org/10.1088/1742-6596/2654/1/012028DOI
Supplementary language notes
-
Language:English
-
Summary in:English
Part of subdatabase
Classification
-
Subject category:art swepub-publicationtype
-
Subject category:ref swepub-contenttype
Notes
-
The present paper investigates the impact of different water penetration criteria on the risk for damage in a common type of building envelope in Nordic countries, timber frame walls with brick masonry veneer. The studied walls are evaluated based on one damage criterion, the risk of mold growth. The study investigates several parameters: water penetration criterion, type of moisture source (uniformly distributed or point source) and its position in the wall assembly, air change rate (ACR) (representing different workmanship scenarios), wind-driven rain (WDR) coefficient, and locations (Gothenburg and Rensjön, with different average annual rainfall and temperature). Two criteria on how to implement water penetration are compared: a) a commonly accepted reference model that assumes one percent of all wind-driven rain deposited on the façade to penetrate the clay brick cladding, and b) a new criterion stating that 3.8% of WDR penetrates when the water content of the brick veneer cladding is above 90% of its saturation capacity. The simulation is done for a thirteen-year period with WUFI Pro and WUFI 2D. The results indicate the greater importance of implementing water penetration compared to ventilation in cavities. Further, the findings suggest that the moisture source's location significantly impacts the mold growth risk. The results also show that the choice of the WDR coefficient affects the risks, which suggests that this factor needs accurate quantification for hygrothermal analyses. The results in this study suggest that an effective measure for the design/maintenance of such walls should incorporate: a) limiting the amount of water penetrating through the cladding, particularly stopping water from reaching the sensitive elements, i.e., timber studs, b) removing extruded mortar stemming from poor workmanship, if any, which may act as a capillary bridge.
Subject headings and genre
Added entries (persons, corporate bodies, meetings, titles ...)
-
Abdul hamid, ALund University,Lunds universitet,Avdelningen för Byggnadsfysik,Institutionen för bygg- och miljöteknologi,Institutioner vid LTH,Lunds Tekniska Högskola,Division of Building Physics,Department of Building and Environmental Technology,Departments at LTH,Faculty of Engineering, LTH(Swepub:lu)bygg-ama
(author)
-
Avdelningen för KonstruktionsteknikInstitutionen för bygg- och miljöteknologi
(creator_code:org_t)
Related titles
-
In:Journal of Physics: Conference Series26541742-6596
Internet link
Find in a library
To the university's database