SwePub
Sök i LIBRIS databas

  Utökad sökning

id:"swepub:oai:lup.lub.lu.se:39d9cc63-63d3-4e65-9290-16d31cc3d5e2"
 

Sökning: id:"swepub:oai:lup.lub.lu.se:39d9cc63-63d3-4e65-9290-16d31cc3d5e2" > Towards a common be...

  • Rosén, ChristianLund University,Lunds universitet,Industriell elektroteknik och automation,Institutionen för biomedicinsk teknik,Institutioner vid LTH,Lunds Tekniska Högskola,Industrial Electrical Engineering and Automation,Department of Biomedical Engineering,Departments at LTH,Faculty of Engineering, LTH (författare)

Towards a common benchmark for long-term process control and monitoring performance evaluation

  • Artikel/kapitelEngelska2004

Förlag, utgivningsår, omfång ...

  • 2004

Nummerbeteckningar

  • LIBRIS-ID:oai:lup.lub.lu.se:39d9cc63-63d3-4e65-9290-16d31cc3d5e2
  • https://lup.lub.lu.se/record/254712URI
  • https://lup.lub.lu.se/record/694763URI

Kompletterande språkuppgifter

  • Språk:engelska
  • Sammanfattning på:engelska

Ingår i deldatabas

Klassifikation

  • Ämneskategori:art swepub-publicationtype
  • Ämneskategori:ref swepub-contenttype

Anmärkningar

  • The COST/IWA benchmark simulation model has been available for seven years. Its primary purpose has been to create a platform for control strategy benchmarking of biological wastewater treatment processes. The fact that the benchmark has resulted in more than 100 publications, not only in Europe but also worldwide, demonstrates the interest for such a tool in the research community. In this paper, an extension of the benchmark simulation model no. 1 (BSM1) is proposed. It aims at facilitating evaluation of two closely related operational tasks: long-term control strategy performance and process monitoring performance. The motivation for the extension is that these two tasks typically act on longer time scales. The extension proposed here consists of 1) prolonging the evaluation period to one year (including influent files), 2) specifying time varying process parameters and 3) including sensor and actuator failures. The prolonged evaluation period is necessary to obtain a relevant and realistic assessment of the effects of such disturbances. Also, a prolonged evaluation period allows for a number of long-term control actions/handles that cannot be evaluated in a realistic fashion in the one week BSM1 evaluation period. In the paper, models for influent file design, parameter changes and sensor failures, initialization procedure and evaluation criteria are discussed. Important remaining topics, for which consensus is required, are identified. The potential of a long-term benchmark is illustrated with an example of process monitoring algorithm benchmarking.

Ämnesord och genrebeteckningar

Biuppslag (personer, institutioner, konferenser, titlar ...)

  • Jeppsson, UlfLund University,Lunds universitet,Industriell elektroteknik och automation,Institutionen för biomedicinsk teknik,Institutioner vid LTH,Lunds Tekniska Högskola,Industrial Electrical Engineering and Automation,Department of Biomedical Engineering,Departments at LTH,Faculty of Engineering, LTH(Swepub:lu)iea-uje (författare)
  • Vanrolleghem, PA (författare)
  • Industriell elektroteknik och automationInstitutionen för biomedicinsk teknik (creator_code:org_t)

Sammanhörande titlar

  • Ingår i:Water Science and Technology50:11, s. 41-490273-1223
  • Ingår i:[Host publication title missing]50:11, s. 41-49

Internetlänk

Hitta via bibliotek

Till lärosätets databas

Hitta mer i SwePub

Av författaren/redakt...
Rosén, Christian
Jeppsson, Ulf
Vanrolleghem, PA
Om ämnet
TEKNIK OCH TEKNOLOGIER
TEKNIK OCH TEKNO ...
och Elektroteknik oc ...
och Annan elektrotek ...
Artiklar i publikationen
Water Science an ...
Av lärosätet
Lunds universitet

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy