SwePub
Sök i LIBRIS databas

  Utökad sökning

WFRF:(Lindahl Göran 1961)
 

Sökning: WFRF:(Lindahl Göran 1961) > Aggregation of fact...

Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications

Adam, Abderisak, 1988 (författare)
Chalmers tekniska högskola,Chalmers University of Technology
Josephson, Per-Erik, 1960 (författare)
Chalmers tekniska högskola,Chalmers University of Technology
Lindahl, Göran, 1961 (författare)
Chalmers tekniska högskola,Chalmers University of Technology
 (creator_code:org_t)
2017
2017
Engelska.
Ingår i: Engineering, Construction and Architectural Management. - 1365-232X .- 0969-9988. ; 24:3, s. 393-406
  • Tidskriftsartikel (refereegranskat)
Abstract Ämnesord
Stäng  
  • PurposeThe purpose of this paper is to explore the impact that cost overruns and time delays exert on large public construction projects to clarify how past and current research regard factors causing cost overruns and time delays in large public construction projects.Design/methodology/approachThis paper, which is based on an analysis of a literature selection consisting of 40 journal articles, investigates and ranks the occurrence of and the explanations for cost overruns and time delays in large public construction projects. The study makes use of a kiviat diagram/radar chart in order to visualize multivariate data.FindingsAggregated rankings of important causes of cost overruns and time delays are reported. These show a strong emphasis on the management aspect as a primary cause of cost overruns and delays. Additionally, there seems to be a trend toward deemphasizing the role of financial considerations in explaining cost overruns and delays. It is argued that there needs to be a more rigorous assessment of the impact that each factor has on cost increases and delays based on factual observed data as opposed to retrospective accounts from questionnaire respondents.Research limitations/implicationsOnly public construction projects have been considered. The results will not be directly applicable to privately funded construction projects and/or projects of a smaller size.Originality/valueThe use of trend data, as illustrated in a kiviat diagram, showing how different ranking factors causing cost overruns and time delays has changed in importance over time.

Ämnesord

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering (hsv//eng)
TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Infrastrukturteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Infrastructure Engineering (hsv//eng)
TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Annan samhällsbyggnadsteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Other Civil Engineering (hsv//eng)

Nyckelord

Cost estimates
Project management
Public sector organizations
Costs
Construction operations
Construction management

Publikations- och innehållstyp

art (ämneskategori)
ref (ämneskategori)

Hitta via bibliotek

Till lärosätets databas

Sök utanför SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Stäng

Kopiera och spara länken för att återkomma till aktuell vy