SwePub
Sök i LIBRIS databas

  Extended search

WFRF:(Rempling Rasmus 1976)
 

Search: WFRF:(Rempling Rasmus 1976) > Integrated project ...

Integrated project team performance in early design stages – performance indicators influencing effectiveness in bridge design

Ekström, Daniel P T, 1976 (author)
WSP Sverige AB,Chalmers tekniska högskola,Chalmers University of Technology
Rempling, Rasmus, 1976 (author)
Chalmers tekniska högskola,Chalmers University of Technology
Plos, Mario, 1963 (author)
Chalmers tekniska högskola,Chalmers University of Technology
 (creator_code:org_t)
2019-01-22
2019
English.
In: Architectural Engineering and Design Management. - : Informa UK Limited. - 1745-2007 .- 1752-7589. ; 15:4, s. 249-266
  • Journal article (peer-reviewed)
Abstract Subject headings
Close  
  • To create multi-functional and integrated project teams, and to adopt a team perspective in the early design stages, it is recognised in the literature that a more effective process is required; one that reduces the probability of costly changes and difficulties during construction. This paper presents an evaluation of project team collaboration during early design and development of construction documents for bridges in Sweden. The purpose was to study key variables influencing the performance of integrated project teams by using importance performance analysis (IPA). A self-evaluation questionnaire addressed clients, contractors, and structural engineering consultants in the Swedish bridge construction industry. The questionnaire addressed three essential cornerstones of value-creation during the engineering design process; culture, structure and competence. These were addressed at three organisational hierarchy levels, the organisation, project, and the individual level. Our results show that increased support and resources are required at the project level for better project team performance. Results further identify that project culture needs to be developed including both collaboration and social relationships as well as project competence, especially the ability to solve mutual issues. This research offers a ‘generalised’ and prioritised view of the challenges in the Swedish bridge construction industry in terms of creating integrated project teams.

Subject headings

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Byggproduktion (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Construction Management (hsv//eng)
TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Infrastrukturteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Infrastructure Engineering (hsv//eng)
SAMHÄLLSVETENSKAP  -- Ekonomi och näringsliv -- Företagsekonomi (hsv//swe)
SOCIAL SCIENCES  -- Economics and Business -- Business Administration (hsv//eng)

Keyword

project competence
project culture
organisational hierarchy
Importance performance analysis (IPA)
organisational structure
integrated project teams

Publication and Content Type

art (subject category)
ref (subject category)

Find in a library

To the university's database

Search outside SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Close

Copy and save the link in order to return to this view