Sökning: id:"swepub:oai:lup.lub.lu.se:8b584b57-25ed-4aeb-91cf-9f09779539fb" >
Benchmark Simulatio...
Benchmark Simulation Model No 2: finalisation of plant layout and default control strategy
-
Nopens, I. (författare)
-
Benedetti, L. (författare)
-
- Jeppsson, Ulf (författare)
- Lund University,Lunds universitet,Industriell elektroteknik och automation,Institutionen för biomedicinsk teknik,Institutioner vid LTH,Lunds Tekniska Högskola,Industrial Electrical Engineering and Automation,Department of Biomedical Engineering,Departments at LTH,Faculty of Engineering, LTH
-
visa fler...
-
Pons, M. -N. (författare)
-
Alex, J. (författare)
-
Copp, J. B. (författare)
-
Gernaey, K. V. (författare)
-
Rosen, C. (författare)
-
Steyer, J. -P. (författare)
-
Vanrolleghem, P. A. (författare)
-
visa färre...
-
(creator_code:org_t)
- IWA Publishing, 2010
- 2010
- Engelska.
-
Ingår i: Water Science and Technology. - : IWA Publishing. - 0273-1223 .- 1996-9732. ; 62:9, s. 1967-1974
- Relaterad länk:
-
http://dx.doi.org/10...
-
visa fler...
-
https://lup.lub.lu.s...
-
https://doi.org/10.2...
-
visa färre...
Abstract
Ämnesord
Stäng
- The COST/IWA Benchmark Simulation Model No 1 (BSM1) has been available for almost a decade. Its primary purpose has been to create a platform for control strategy benchmarking of activated sludge processes. The fact that the research work related to the benchmark simulation models has resulted in more than 300 publications worldwide demonstrates the interest in and need of such tools within the research community. Recent efforts within the IWA Task Group on "Benchmarking of control strategies for WWTPs" have focused on an extension of the benchmark simulation model. This extension aims at facilitating control strategy development and performance evaluation at a plant-wide level and, consequently, includes both pretreatment of wastewater as well as the processes describing sludge treatment. The motivation for the extension is the increasing interest and need to operate and control wastewater treatment systems not only at an individual process level but also on a plant-wide basis. To facilitate the changes, the evaluation period has been extended to one year. A prolonged evaluation period allows for long-term control strategies to be assessed and enables the use of control handles that cannot be evaluated in a realistic fashion in the one week BSM1 evaluation period. In this paper, the finalised plant layout is summarised and, as was done for BSM1, a default control strategy is proposed. A demonstration of how BSM2 can be used to evaluate control strategies is also given.
Ämnesord
- TEKNIK OCH TEKNOLOGIER -- Elektroteknik och elektronik -- Annan elektroteknik och elektronik (hsv//swe)
- ENGINEERING AND TECHNOLOGY -- Electrical Engineering, Electronic Engineering, Information Engineering -- Other Electrical Engineering, Electronic Engineering, Information Engineering (hsv//eng)
Nyckelord
- plant-wide modelling
- evaluation criteria
- control
- benchmarking
- BSM2
- wastewater treatment
- simulation
Publikations- och innehållstyp
- art (ämneskategori)
- ref (ämneskategori)
Hitta via bibliotek
Till lärosätets databas
- Av författaren/redakt...
-
Nopens, I.
-
Benedetti, L.
-
Jeppsson, Ulf
-
Pons, M. -N.
-
Alex, J.
-
Copp, J. B.
-
visa fler...
-
Gernaey, K. V.
-
Rosen, C.
-
Steyer, J. -P.
-
Vanrolleghem, P. ...
-
visa färre...
- Om ämnet
-
- TEKNIK OCH TEKNOLOGIER
-
TEKNIK OCH TEKNO ...
-
och Elektroteknik oc ...
-
och Annan elektrotek ...
- Artiklar i publikationen
-
Water Science an ...
- Av lärosätet
-
Lunds universitet