SwePub
Sök i LIBRIS databas

  Extended search

onr:"swepub:oai:DiVA.org:ltu-4655"
 

Search: onr:"swepub:oai:DiVA.org:ltu-4655" > Optimisation of mai...

  • 1 of 1
  • Previous record
  • Next record
  •    To hitlist

Optimisation of maintenance track possession time : A tamping case study

Famurewa, Stephen Mayowa (author)
Luleå tekniska universitet,Drift, underhåll och akustik
Xin, Tao (author)
Luleå tekniska universitet,Drift, underhåll och akustik
Rantatalo, Matti (author)
Luleå tekniska universitet,Drift, underhåll och akustik
show more...
Kumar, Uday (author)
Luleå tekniska universitet,Drift, underhåll och akustik
show less...
 (creator_code:org_t)
2013-07-26
2015
English.
In: Proceedings of the Institution of mechanical engineers. Part F, journal of rail and rapid transit. - : SAGE Publications. - 0954-4097 .- 2041-3017. ; 229:1, s. 42726-
  • Journal article (peer-reviewed)
Abstract Subject headings
Close  
  • Optimum allocation and efficient utilisation of track possession time are becoming important topics in railway infrastructure management due to increasing capacity demands. This development and other requirements of modern infrastructure management necessitate the improvement of planning and scheduling of large-scale maintenance activities such as tamping. It is therefore necessary to develop short-, medium- and long-term plans for performing tamping on a network or track section within a definite time horizon. To this end, two key aspects of infrastructure maintenance planning are considered in this paper, deterioration modelling and scheduling optimisation. An exponential deterioration function is applied to model the geometry quality of a series of 200 m segments of a 130 km line section, and an empirical model for recovery after tamping intervention is developed. These two models are subsequently used to generate a methodology to optimise a schedule for tamping intervention by minimising the total cost of intervention including the cost of track possession while geometry quality is ascertained to be within a desirable limit. The modelling considers two types of tamping interventions, preventive and corrective, with different intervention limits and tamping machines. The result of this paper suggests a tamping plan which will lead to optimum allocation of track possession time while maintaining the track geometry quality within specified limits.

Subject headings

TEKNIK OCH TEKNOLOGIER  -- Samhällsbyggnadsteknik -- Annan samhällsbyggnadsteknik (hsv//swe)
ENGINEERING AND TECHNOLOGY  -- Civil Engineering -- Other Civil Engineering (hsv//eng)

Keyword

Drift och underhållsteknik
Operation and Maintenance

Publication and Content Type

ref (subject category)
art (subject category)

Find in a library

To the university's database

  • 1 of 1
  • Previous record
  • Next record
  •    To hitlist

Find more in SwePub

By the author/editor
Famurewa, Stephe ...
Xin, Tao
Rantatalo, Matti
Kumar, Uday
About the subject
ENGINEERING AND TECHNOLOGY
ENGINEERING AND ...
and Civil Engineerin ...
and Other Civil Engi ...
Articles in the publication
Proceedings of t ...
By the university
Luleå University of Technology

Search outside SwePub

Kungliga biblioteket hanterar dina personuppgifter i enlighet med EU:s dataskyddsförordning (2018), GDPR. Läs mer om hur det funkar här.
Så här hanterar KB dina uppgifter vid användning av denna tjänst.

 
pil uppåt Close

Copy and save the link in order to return to this view